Rittal enclosure cooling unit
55
15 Compact service information
EN
15
Compact service information
For all other service enquiries:
Step
See
OK/comment
Assembly and connection
– Installation site requirements taken into ac-
count
Section 5.2
Assembly instructions
– Observe the relevant assembly instructions
Section 5.3.1
– Condensate water discharge connected
Section 5.3.6
– Electrical installation (overvoltage protection,
door limit switch)
Section 5.4
Commissioning
Check the assembly
– All attachments checked, filter mat fitted
Commissioning
– At least 30 minutes after assembly
Section 6
– Download the Rittal Scan & Service app to
support commissioning and subsequent op-
eration
– Commissioning check carried out via Rittal
Scan & Service app
Operation
– Check the device status during operation
using the Rittal Scan & Service app
– Read maintenance instructions and warnings
or fault messages using the Rittal Scan &
Service app
Tab. 10: Quick installation check
Original spare parts
Maintenance, warranty extensions (up to 5 years), ser-
vice contracts
– Enquire directly via Rittal Scan & Service app
– http://www.rittal.com
– Enquire directly via Rittal Scan & Service app
– http://www.rittal.com
– Enquire at the relevant national company
– http://www.rittal.com/de_de/service_contact/index.asp
Other service contacts worldwide: Rittal International Service HUBs (see section 14 "Customer service addresses")
Tab. 11: Service contacts worldwide