INSTALLATION
Installation Instructions for SIS Bus Bar Systems A2MS001EN revision R05
39 / 130
Cutting, grinding or welding work
……
NOTICE!
Risk of material damage to the bus bar system
from cutting, grinding or welding work!
Sparks or welding spatter can cause considerable
damage to the insulation of the bus bar system.
– Cutting, grinding (angle grinder) or welding
work must not be performed in the vicinity of
the bus bar system.
– If this kind of work cannot be avoided in the
vicinity of the bus bar system being installed,
suitable safety measures (e.g. covers) must
be provided to protect the bus bar elements.
4.2
PREREQUISITES FOR
INSTALLATION
The following describes which prerequisites must be in place for
installation of bus bars:
– The connection sleeves have been cleaned on the
inside. The same applies for the surface of the bar in
order to ensure the inside of the connection sleeve is
free from dust. To do so, it is recommended to use
acetone.
– Take measures to isolate, and keep components
isolated, from the voltage for the installation work:
o
Isolate from the voltage.
o
Secure to prevent from being switched back on.
o
Make sure parts are no longer live with voltage.
o
Earth and short-circuit.
o
Cover or section off neighboring parts which
are live with voltage.
– The construction requirements have been checked and
met.
– Installation aids with sufficient load bearing capacity
(crane, lifting gear, etc.) are intact and available.
– The components to be connected are positioned
correctly at the installation location in accordance with
the drawing. Measurements have been made before
installation.