Installing the SteelConnect SDI-2030 and SDI-5030 Gateways | 19
Rack mounting the SteelConnect SDI-2030 and SDI-5030 gateways
3. Remove the inner member from the gateway. Press the safety lock to release the inner member. (See
.)
Figure 2-7. Removing the rail
To mount a gateway in a four-post rack using the RMK-1-PRAIL kit
Note:
The RMK-1-PRAIL kit does not require the use of tools; however, there is an option to use a screw on each
rail for added stability.
1. Install the rails to the rack posts. Insert the rail into the rack holes. Use the slide to move the bracket
inside of the rack. Once the rail is in the correct holes, release the extendable part of the rail and the
bracket will snap in place and lock. (See
Note:
You can use a screw on each rail for added stability.
Figure 2-8. Installing the rails to the rack