26
SteelConnect SDI-5030 Gateway Hardware Installation Guide
Replacing SteelConnect Gateway SDI-5030 Components
Removing and installing the air duct
Installing the chassis cover
1.
Place the top cover on the gateway and slide it toward the front of chassis until the recessed front
edge fits smoothly under the chassis edge and the locking pins are fully engaged.
Figure 3-4. Installing the cover
2.
Install the two captive installation screws at the rear of the unit and then secure the screw at the
top if there is a screw.
Removing and installing the air duct
The gateway requires an air duct for proper airflow. Always operate your gateway with the air duct in
place.
Note:
You need to remove the air duct to access many internal components.