Made in Viet Nam
email: info@riverside-furniture.com
Components and Hardware List
Page 1 of 2
44732
Executive Desk
Allegro
Home Office
Assembly Instructions
A
B
C
D
4 sets.
File Rod & Clips
1 pc.
Grommet
Bun Foot W / Leveler
8 pcs.
2 sets.
Key
E
F
Center Drawer Divider
Top Drawer Divider
4 pcs.
4 pcs.
Be sure to check all packing material carefully for small parts,which
may have come loose inside the carton during shipment.
Step 1 : Place the desk on a clean, soft surface such
as a blanket or carpet. Remove and discard the shipping
rail attached to the bottom of the desk .
WARNING
Pinch Point.
Keep fingers
from underneath
drawer front
when releasing.
Remove the screws and
discard the shipping rail.
G
Pencil Tray
1 pc.
A