WWW.RSIWW.COM
9 of 45
Assemble Base
Make certain the pieces are in the correct positions before securing.
Carefully follow the order of assembly to ensure an easy installation.
Wear proper safety gear including work shoes, gloves and goggles.
The base is made up of four P-1A, four P-1B, four P-2A and four P-2B
profiles. Arrange profiles in a rectangle as shown. Position P-2A and
P-2B profiles at back sides of the greenhouse.
1.1
WARNING: Use extreme caution when handling profiles P-1A, P-1B, P-2A
and P-2B. The bottoms may have sharp edges near the drilled holes. The
cut edges on the corners of these profiles are sharp.
IMPORTANT: Make sure the base fits properly on your
foundation. If not, stop and fix your foundation.
P-2A
P-2A
P-2A
P-2B
P-2B
P-2B
P-1B
P-1B
P-1B
P-1B
P-1A
P-1A
P-1A
P-1A
FRONT
BACK
IMPORTANT: Position
P-2A and P-2B profiles
at back of greenhouse.
QTY
Profile
4
P-1A
4
P-1B
3
P-2A
3
P-2B
52
1
/
8
”
50½”