WWW.RSIWW.COM
39 of 45
G-4
W-1
G-1
F-7
C-1
G-4
F-7
W-1
G-1
G-1
NOTE: VIEWS FROM OUTSIDE.
NOTE: VIEWS FROM OUTSIDE.
NOTE: To aid in rain collection and prevent water leakage we recommend
sealing the inside of the gutter profiles at each joint using silicone caulking.
Have one person stand outside the greenhouse to observe the position of the
roof ridge while the other person installs the four B-9 braces. Insert T-bolt
in the correct position, but if the roof is not completely straight, adjust the
brace to raise or lower the roof line.
Secure each with two S-2C caps.
The G-4 and G-4E trim plates snap into G-1 and G-2 gutter profiles to hold roof panels in place.
Working from outside, begin at front corner. Run a bead of silicone sealant along ledge of G-1 and
G-2 profiles. Use two G-4 and four G-4E trim plates on each side. Position G-4 trim plate over
gutter and use handle of screw driver to tap into place. Make sure the seams of the trim plates
are flush with each other and to the C-1 connectors at the front. Add a bead of silicone where
trim plates meet.
Screw G-3 gutter drain into holes
in C-1 connectors. Make sure they
point down.
8.8
8.9
8.10
NOTE: VIEWS FROM INSIDE.
B-9
B-9
S-2C
8
4
Brace
QTY
QTY
Trim Plate
G-4
4
G-4E
6
49
¾”
48½”
C-1
G-3
G-3
4
Gutter Drain
QTY
NOTE: View for alignment
of G-4 and G-1 only.