WWW.RSIWW.COM
45 of 45
NOTE: The S-4 screw is designed to be used with wood. When securing base to
foundations made of materials other than wood, use an appropriate fastener.
Secure to Platform
Make certain the pieces are in the correct positions before securing.
Carefully follow the order of assembly to ensure an easy installation.
Wear proper safety gear including work shoes, gloves and goggles.
The base has predrilled holes in the inside and outside bolt channels
making it easy to secure your greenhouse to a wood platform. Use one
S-4 wood screw in each hole in the base. Screw through the wood platform
until each screw is flush with base profile. Continue process around outside and
inside until greenhouse is evenly secured.
Attach anchor bracket with two T-bolts
in the inside bolt channels in base profile.
Secure with two S-2C caps. Repeat to
install eleven remaining brackets.
Insert A-1 ground anchor through hole in
center of A-2 bracket. Place a screw driver
through the top of A-1 anchor to screw
completely into soil. Repeat to install eleven
remaining ground anchors. Make certain all
are properly secured in ground.
Use twelve A-1 ground anchors with twelve A-2 anchor brackets on the inside of the greenhouse to
secure it to the ground. Place one on each side at the front, center and back.
11.1
11.2A
11.2B
S-4
S-4
104
Connector
QTY
A-2
A-1
A-2
12
Bracket
QTY
A-1
12
Ground Anchor
QTY
S-2C 24