Framing Endwalls
Endwall studs will be pre-cut
. Door headers, Door studs and horizontal
purlin will have to be field cut.
Refer to the page(s) labeled Endwall Layouts for proper placement and
measurements of your purlin & door studs.
The illustrations below show connection details for attaching door studs to
the groundrail and rafter, also the proper placement of "L" brackets when
framing an opening for a door or fan.
1.
2.
FRONT ENDWALL
REAR ENDWALL
outside
greenhouse
inside
greenhouse
2'' x 2''
door stud
welded
stanchion
groundraill
tek screw
thru door
stud &
stanchion
rafter
endwall/door
stud
horizontal purlin
2''x6'' flat bracket
1.install front/rear door
studs over the welded
stanchions and secure
using #14 tek screws
2. view from inside and at
the end rafter. Connect the
endwall studs to the rafters
using 2x6 flat bracket and
#14 tek screws
1.
2.
endwall horizontal
purlin
door
header
door
or
endwall
studs
IF YOUR GREENHOUSE HAS AN EVAPORATIVE COOLING SYSTEM
refer to the Endwall Layout (rear endwall w/ evaporative cooling system) page
SIDEWALL HEIGHT
WIDTH
L bracket
fan/shutter opening
fan/shutter opening
Page 10
Summary of Contents for Thoreau Series
Page 2: ......