FOUNDATION
IMPORTANT:
It is very important to begin with a level surface. Check your foundation to ensure it
is level at every point. You must assure your foundation is square and level before beginning
assembly.
After choosing a location, proper preparation of the site is essential. The site
must be
level.
The
Scholar
greenhouse can be mounted two ways: on concrete slab or concrete footer.
12'- 8''
24'-10''
4" from edge
OVER HEAD VIEW
concrete slab
turndown
varies
3''
3''
4'' slab
45°
rebar continuous at perimeter
laps a minimum of 25'' with 4 ties evenly spaced
gray dashed lines =
groundrails for greenhouse
END VIEW OF TYPICAL CONCRETE SLAB
When pouring concrete slab be sure to make the slab
10'' longer and 8'' wider
than your order size.
An example is shown above:
OVERHEAD VIEW concrete slab
shows a greenhouse order for a 12' x 24' Scholar.
The slab is poured 12'-8''wide and 24'-10'' long. Set front/rear groundrails 4'' inward from edge of concrete and
side groundrails are set 4'' inward from edge of concrete.
FOOTER
turndown
varies
12''
3''
3"
rebar continuous at perimeter
laps a minimum of 25'' with 4 ties evenly spaced
Groundrails will also be set the same on footer
as on concrete slab
12''
12''
Length (plus 10'')
Width
(plus 8'')
ground rails
ground rails
4'' from edge
12''
Page 1
Summary of Contents for Thoreau Series
Page 2: ......