Sidewall & Roof Assembly
1.
Identify legs for sidewalls:
2'' x 2'' square tubing,
quantity
depending on
order
(refer to packing slip)
The length of the legs depend on the sidewall height of your
order. A sidewall height of 5'-0'' will have legs
58'' long
, so the
legs will measure 2'' shorter than the ordered sidewall height.
side
groundrails
corner
legs
2. Place legs on groundrail
stanchions and secure
using #14 tek screws
VIEW AT
INTERMEDIATE LEG
VIEW AT CORNER
#14 tek screw
3.
After attaching legs to the side groundrails, identify brackets named:
Corner Bow to Column Brackets & Intermediate Bow to Column Brackets
4.
Insert the brackets into the top of the legs, let the 1'' flat bar rest on the lip of the leg
as shown below. Note on the corner brackets, the 1'' flat bars have to be facing each other
as indicated in corner bracket profiles.
5.
Take the assembled rafters and slide them onto the column brackets and secure working from
the inside of the greenhouse using #14 tek screws
as shown in detail A
.
corner column
bracket
profiles
intermediate column
bracket
profile
intermediate leg
corner leg
corner leg
corner bracket holes are facing each other
intermediate
legs
line indicates
lip of leg
1'' flat bar
#14 tek screw attaching
column bracket to leg
#14 tek screw attaching rafter to
column bracket
end rafter
leg
column
bracket
detail A
Page 5