background image

2

1.  General

  1.1.1 

description of the equipment

 ........................................................................................................................................................................................................................................

page 

3

1.2  

intended use

 .........................................................................................................................................................................................................................................................................................................

page 

3

1.3  

delivery

 ..............................................................................................................................................................................................................................................................................................................................

page 

4

1.4 

on site connections

 ...............................................................................................................................................................................................................................................................................

page 

4

2.  Installation and commissioning

 

2.1  

installation

 ..................................................................................................................................................................................................................................................................................................................

page 

5

2.2 

Final assembly of the equipment

 ............................................................................................................................................................................................................................

page 

6

2.3  

Commissioning

 ................................................................................................................................................................................................................................................................................................

page 

6

3.   Description of the step equipment

 

3.1 

Fun Pak   "royal“/attractions and Functional overview

 ........................................................................................................................................

page 

7

3.2 

Fun Pak   "Capri“/attractions and Functional overview 

 .......................................................................................................................................

page 

8

3.3 

Fun Pak   "rimini“/attractions and Functional overview 

 ...................................................................................................................................

page 

9

3.4 

Fun Pak   "modena 370“/attractions and Functional overview 

 ..........................................................................................................

page  10

3.5 

Fun Pak   "modena 660“/attractions and Functional overview 

 ..........................................................................................................

page  11

3.6 

Fun Pak   "modena 520“/attractions and Functional overview 

 ..........................................................................................................

page  12

3.7 

Fun Pak   "royal with overflow“/attractions and Functional overview 

 ............................................................................

page  13

5.   Overwinterung

page  14

6.   Assembly notes for the diverter valve in the jet insert

page  15

Information:

additional information is available from our technical customer service.

We reserve the right to make changes or improvements in production, in line with technical developments.

Contents

Summary of Contents for Fun Pak F4

Page 1: ...Technical Information SB 13 09 09 Operating instructions Fun Pak F 4 Counter current and massage equipment...

Page 2: ...n Pak Rimini Attractions and Functional overview page 9 3 4 Fun Pak Modena 370 Attractions and Functional overview page 10 3 5 Fun Pak Modena 660 Attractions and Functional overview page 11 3 6 Fun Pa...

Page 3: ...k as a standard feature is delivered completely pre assembled in the pool For this the RivieraPool foundation shaft is required for the corresponding steps If due to lack of space or building reasons...

Page 4: ...Our foundation shafts are fitted as standard with a shaft drain bonded connector d 50 Exception swimming pools with a shower tray or filtration equipment installed in the equipment shaft are additiona...

Page 5: ...aerator and humidity switch Set humidity switch to 65 The aerator must also run in winter when the swimming pool is switched off 4 Before doing the classing lay the shaft cover Leave sufficient space...

Page 6: ...nsert latching lightly into place To operate the jet inserts switch off the pump The power can be regulated by partially turning the jet insert Air can be mixed into the counter current swimming syste...

Page 7: ...nt system can be switched to the left or right onto the other attractions In this case turn off the massage pumps before moving the jets The counter current jets operate when the jets are in their mid...

Page 8: ...her attractions In this case turn off the massage pumps before moving the jets The counter current jets operate when the jets are in their middle position turn left hand jet to the left Masterjet mass...

Page 9: ...ets can be manually switched to 2 Microjet massage jets and a master jet in the seating area a floor geyser in the foot area optional around the seating step and a water torrent in the pool wall Pump...

Page 10: ...tem can be switched to the left or right onto the other attractions In this case turn off the massage pumps before moving the jets The counter current jets operate when the jets are in their middle po...

Page 11: ...counter current system can be switched to the left or right onto the other attractions In this case turn off the massage pumps before moving the jets The counter current jets operate when the jets are...

Page 12: ...e counter current system can be switched to the left or right onto the other attractions In this case turn off the massage pumps before moving the jets The counter current jets operate when the jets a...

Page 13: ...unter current system can be switched to the left or right onto the other attractions In this case turn off the massage pumps before moving the jets The counter current jets operate when the jets are i...

Page 14: ...ockwise and withdrawing them from the jet element Loosen the Z bracket of the counter current equipment and remove the jets Plug the overwintering stoppers delivered with the system into the base of t...

Page 15: ...t opening of the jet bushing Attach the jet closers made from transparent PVC pipe and screw on the locking ring hand tighten While doing this ensure the diverter opening does not move in the process...

Page 16: ...www pools de One of the leading German manufacturers of prefabricated swimming pools swimming pool technology and whirlpools Member of BSW...

Reviews: