6
Installation and commissioning
2.2
Final assembly of the equipment
- Check for threaded screw and pipe connectors on the suction and pressure
sides, between pumps and jets and tighten as necessary, as they could have
loosened during transport.
- mount handles.
- Plug in jet inserts and lock them in.
- mount the jet holders.
- mount the bezels.
- the pumps should be connected by a local specialist company approved
according to appropriate regulations (see circuit diagram, page 5).
2.3
Commissioning
Commissioning should only be carried out when the pool is full.
- switch on the pumps by pressing the Pn button.
- switch off the pumps by pressing the Pn button again.
the functions neck shower, back massage, counter-current swimming system
are selected by turning the corresponding jet insert. the corresponding
setting is confirmed by the jet insert latching lightly into place. to operate
the jet inserts switch off the pump.
- the power can be regulated by partially turning the jet insert.
- air can be mixed into the counter-current swimming system by opening the
air regulator of the corresponding jet stream. all other jets are permanently
supplied with air.
note:
the integrated water torrent of the rimini stair equipment is designed to be
clad with kerbstones (corresponding adhesive is enclosed). the rotatable
jets do not regulate the individual functions in total isolation of one another.
the seals needed to achieve this would detract from the free movement when
turning the jets. therefore a small stream of water will come out of all jets. the
rotatable jet that feed the neck torrent is fitted with an additional injector that
sucks water out of the neck shower. in this way, in the Jet function, there is
always some air in the jet stream.
1
2
3
4
5
Water torrent in the "rimini" step
equipment
detail counter-current swimming
system
3
1
2
"rimini" equipment shaft
5
4