RIX
Industries
MAN
‐
2V3B
‐
4.1V
‐
P1
Page
3
on the crankcase cover plate. Change oil every 3000 hours, or annually, whichever comes first.
The unit has been shipped dry, so the User is responsible for adding oil prior to the first run.
Automotive type oil is recommended, either synthetic or carbon based. Synthetic is recommended
in cold temperatures. Multi-viscosity oil is acceptable. Synthetic compression oils are not suitable.
CRANKCASE OIL CAPACITY:
1 3/4 Quarts (1.66 liters)
VISCOSITY:
Above 60
˚
F. -
SAE 30W
Between 32
˚
and 60
˚
F -
SAE 20W
Between 20
˚
and 32
˚
F -
SAE 10W - synthetic oil preferred
Below 20
˚
F - SAE 5W -
synthetic oil required
2.4
ELECTRICAL
CONNECTIONS
The unit must be wired to a source of power in accordance with applicable codes. The compressor
should be connected to power such that the cooling fan pulls air over the heat exchanger.
2.5
STORAGE
If the compressor is taken out of service, provision should be made to protect against corrosion. At
a minimum, gas suction and discharge lines should be capped. The compressor should be rotated at
least once every 2 months. In corrosive environments, the distance pieces should be sealed and the
unit nitrogen purged.
After an extended storage (or if stored without climate control) the crankcase cover plate should be
removed and the roller bearings inspected for possible corrosion. Apply oil to all bearings before
replacing cover. Also, lift up oil packing boxes (inside distance pieces) and lubricate guide
cylinders.
Summary of Contents for 2V3B-4.1V-P1A
Page 46: ...RIX Industries MAN 2V3B 4 1V P1 Page 37 FIGURE 1 GENERAL COMPRESSOR DETAIL 1 4 ...
Page 47: ...RIX Industries MAN 2V3B 4 1V P1 Page 38 FIGURE 2 GENERAL COMPRESSOR DETAIL 2 4 ...
Page 48: ...RIX Industries MAN 2V3B 4 1V P1 Page 39 FIGURE 3 GENERAL COMPRESSOR DETAIL 3 4 ...
Page 49: ...RIX Industries MAN 2V3B 4 1V P1 Page 40 FIGURE 4 COMPRESSION VALVE DETAIL ...
Page 50: ...RIX Industries MAN 2V3B 4 1V P1 Page 41 FIGURE 5 GENERAL COMPRESSOR DETAIL 4 4 ...
Page 51: ...RIX Industries MAN 2V3B 4 1V P1 Page 42 FIGURE 6 FIRST STAGE COMPRESSION STAGE DETAIL ...
Page 53: ...RIX Industries MAN 2V3B 4 1V P1 Page 44 FIGURE 8 SUCTION AND FIRST STAGE PLUMBING DETAIL ...
Page 54: ...RIX Industries MAN 2V3B 4 1V P1 Page 45 FIGURE 9 SECOND AND THIRD STAGE PLUMBING DETAIL ...
Page 55: ...RIX Industries MAN 2V3B 4 1V P1 Page 46 FIGURE 10 FINAL DISCHARGE PLUMBING DETAIL ...
Page 56: ...RIX Industries MAN 2V3B 4 1V P1 Page 47 FIGURE 11 CRANKCASE ASSEMBLY DETAIL ...
Page 57: ...RIX Industries MAN 2V3B 4 1V P1 Page 48 FIGURE 12 CONNECTING ROD DETAIL ...
Page 58: ...RIX Industries MAN 2V3B 4 1V P1 Page 49 FIGURE 13 CONTROL BOX ASSEMBLY DETAIL 1 3 ...
Page 59: ...RIX Industries MAN 2V3B 4 1V P1 Page 50 FIGURE 14 CONTROL BOX ASSEMBLY DETAIL 2 3 ...
Page 60: ...RIX Industries MAN 2V3B 4 1V P1 Page 51 FIGURE 15 CONTROL BOX ASSEMBLY DETAIL 3 3 ...
Page 61: ...RIX Industries MAN 2V3B 4 1V P1 Page 52 FIGURE 16 WIRING SCHEMATIC ...
Page 62: ...RIX Industries MAN 2V3B 4 1V P1 Page 53 FIGURE 17 ELECTRICAL SCHEMATIC ...
Page 65: ...RIX Industries MAN 2V3B 4 1V P1 Page 55 FIGURE 18 FLOW SCHEMATIC ...
Page 70: ...RIX P N 76 713 X76 713 DWG A8042 CUI SP CTI PROPIN ...
Page 71: ...RIX P N 76 713 X76 713 DWG A8042 CUI SP CTI PROPIN ...
Page 77: ......
Page 78: ......
Page 79: ......
Page 80: ......
Page 81: ... ǣ ...
Page 82: ... Ǥ ǣ ...