OXYGEN
COMPATIBILITY
REQUIREMENTS
DANGER
To prevent
FIRE,
SERIOUS
INJURY
or
DEATH
, it is the User’s
responsibility to ensure that all oxygen wetted parts used in the
compressor are cleaned for oxygen service prior to installation.
Oxygen compression equipment has very stringent requirements due to the hazards inherent in the
compression process. Cleaning and handling must be in accordance with Compressed Gas
Association
publication
CGA
G
‐
4.1
, Cleaning Equipment for Oxygen Service.
www.cganet.com.
Any
work to be done on the compressor where the gas stream may be exposed must be done in
accordance with CGA procedures. RIX recommends that all maintenance be performed by qualified
personnel with full knowledge of oxygen equipment handling procedures and the potential hazards
of contamination. RIX further recommends returning the compressor package to RIX Industries or
RIX-approved service center when servicing or repairing this compressor package.
All gas plumbing and storage systems connected to the compressor must be oxygen clean,
constructed of oxygen compatible materials, and designed to safely handle the operating and design
pressures as defined in the registration page of this manual. Use only oxygen compatible O-ring
grease, such as RIX P/N 45-1007, and either Viton or Teflon O-rings in gas piping areas.
Factory cleaned oxygen parts are denoted by an “X” prefix at the beginning of the part number. It is
the User’s responsibility to maintain the cleanliness of factory cleaned parts and any existing
portions of the gas stream that may be exposed during installation or maintenance.
After any maintenance in which the gas stream of the unit becomes exposed, User should perform an
O2 burn-in, see
Section
3.2.
During this time personnel should be separated from the compressor.
Summary of Contents for 2V3B-4.1V-P1A
Page 46: ...RIX Industries MAN 2V3B 4 1V P1 Page 37 FIGURE 1 GENERAL COMPRESSOR DETAIL 1 4 ...
Page 47: ...RIX Industries MAN 2V3B 4 1V P1 Page 38 FIGURE 2 GENERAL COMPRESSOR DETAIL 2 4 ...
Page 48: ...RIX Industries MAN 2V3B 4 1V P1 Page 39 FIGURE 3 GENERAL COMPRESSOR DETAIL 3 4 ...
Page 49: ...RIX Industries MAN 2V3B 4 1V P1 Page 40 FIGURE 4 COMPRESSION VALVE DETAIL ...
Page 50: ...RIX Industries MAN 2V3B 4 1V P1 Page 41 FIGURE 5 GENERAL COMPRESSOR DETAIL 4 4 ...
Page 51: ...RIX Industries MAN 2V3B 4 1V P1 Page 42 FIGURE 6 FIRST STAGE COMPRESSION STAGE DETAIL ...
Page 53: ...RIX Industries MAN 2V3B 4 1V P1 Page 44 FIGURE 8 SUCTION AND FIRST STAGE PLUMBING DETAIL ...
Page 54: ...RIX Industries MAN 2V3B 4 1V P1 Page 45 FIGURE 9 SECOND AND THIRD STAGE PLUMBING DETAIL ...
Page 55: ...RIX Industries MAN 2V3B 4 1V P1 Page 46 FIGURE 10 FINAL DISCHARGE PLUMBING DETAIL ...
Page 56: ...RIX Industries MAN 2V3B 4 1V P1 Page 47 FIGURE 11 CRANKCASE ASSEMBLY DETAIL ...
Page 57: ...RIX Industries MAN 2V3B 4 1V P1 Page 48 FIGURE 12 CONNECTING ROD DETAIL ...
Page 58: ...RIX Industries MAN 2V3B 4 1V P1 Page 49 FIGURE 13 CONTROL BOX ASSEMBLY DETAIL 1 3 ...
Page 59: ...RIX Industries MAN 2V3B 4 1V P1 Page 50 FIGURE 14 CONTROL BOX ASSEMBLY DETAIL 2 3 ...
Page 60: ...RIX Industries MAN 2V3B 4 1V P1 Page 51 FIGURE 15 CONTROL BOX ASSEMBLY DETAIL 3 3 ...
Page 61: ...RIX Industries MAN 2V3B 4 1V P1 Page 52 FIGURE 16 WIRING SCHEMATIC ...
Page 62: ...RIX Industries MAN 2V3B 4 1V P1 Page 53 FIGURE 17 ELECTRICAL SCHEMATIC ...
Page 65: ...RIX Industries MAN 2V3B 4 1V P1 Page 55 FIGURE 18 FLOW SCHEMATIC ...
Page 70: ...RIX P N 76 713 X76 713 DWG A8042 CUI SP CTI PROPIN ...
Page 71: ...RIX P N 76 713 X76 713 DWG A8042 CUI SP CTI PROPIN ...
Page 77: ......
Page 78: ......
Page 79: ......
Page 80: ......
Page 81: ... ǣ ...
Page 82: ... Ǥ ǣ ...