STEP 21
OPEN BAG H1A. MOUNT THE ROLL CAGE SIDES TO
THE CHASSIS WITH 3/8 BUTTON HEAD SCREWS. USE THE
1/4” (SHORT) SCREWS IN THE FRONT HOLES. ADD THE JAM
NUT FROM BAG A AT THE REAR OF THE TIE BAR.
4
STEP 22
USE 1/2” BUTTON HEAD SCREWS AND THREE
CHASSIS SPACERS TO ATTACH THE TWO SIDES OF THE
ROLL CAGE TOGETHER.
STEP 23
PAINT THE HOOD AND TAIL TANK PARTS AND
THE SIDE PANELS AND TRIM THEM OUT AS SHOWN BY
THE TRIM LINES ON THE PARTS. DRILL THE HOLES
MARKED WITH A 1/8 “ DRILL TO MOUNT THEM TO THE
CHASSIS. THE TWO HOLES IN THE SIDES OF THE TAIL
TANK SNAP OVER THE TWO SCREWS THAT HOLD THE
REAR OF THE ROLL CAGE TO THE CHASSIS AND YOU
WILL NEED TO REMOVE THE BOTTOM SCREW THAT
HOLDS THE LOWER REAR BAR TO THE 1/2” SPACER TO
ATTACH THE REAR OF THE TAIL TANK.
STEP 24
TO MOUNT THE SIDE PANELS,
LOOSEN THE SCREWS THAT HOLD THE FRONT
OF THE NERF BARS AND REMOVE THE
SCREWS THAT ATTACH THE CENTER OF THE
ROLL CAGE TO THE CHASSIS. SLIDE THE SIDE
PANEL OVER THE REAR OF THE NERF BAR AND
BETWEEN THE FRONT OF THE NERF BAR AND
THE CHASSIS. TIGHTEN THE FRONT NERF BAR
SCREW AND REPLACE THE SCREW TO HOLD
THE SIDE PANEL IN PLACE. REPEAT FOR THE
OPPOSITE SIDE. TO INSTALL THE HOOD, SLIDE
IT BETWEEN THE CAGE SIDES AND SPREAD IT
OUT SO IT WILL GO OVER THE SIDE PANEL
FLANGES. TRIM SLIGHTLY IF NECESSARY. YOU
CAN USE TAPE OR VELCRO TO HOLD THE REAR
OF THE HOOD OVER THE CHASSIS BRACE IF
NEEDED.
DRILL
BEND REAR EDGE UNDER SLIGHTLY