14
OPERATION INSTRUCTION
Check ng the Battery Pack Before Us ng for the F rst T me
Ÿ
The battery pack s prov ded part ally charged. To ensure full battery pack capac ty, completely charge the
battery pack before us ng for the first t me.
Battery Care
L -LON recommended charg ng t me: 5-6 hours
Ÿ
For a complete,100% charg ng, leave the battery on the charger for one full hour after the charger nd cator
l ght turns green.
Ÿ
D str butors should charge the batter es as soon as rece v ng the E-b ke from suppl er.
Ÿ
*Never charge batter es for longer than 24 hours*.
Ÿ
The rated output capac ty of a battery s measured at 77”F(25”C).Any var at on n th s temperature w ll
WARNING
SLA(sealed lead ac d)recommended charg ng t me: 6-8 hours
Ÿ
L - on batter es do not have a ‘’memory.’’ Part al d scharge/charge cycles w ll not harm the batter es’
capac ty or performance.
Ÿ
Even w th proper care, rechargeable batter es do not last forever. Every t me the battery s d scharged and
subsequently recharged, Its relat ve capac ty decreases by a small percentage. You can max m ze the l fe
of your battery by follow ng the nstruct ons n th s gu de. Battery should be fully charged mmed ately when
they are rece ved for the full recommended charge t mes.