37
Appendix
Operating manual neoTower® Premium L / 03.2017
12.1.2 Heating system variant 2 –
1 neoTower, 2 buffer tanks, peak load boiler connected directly to buffer tank
A
B
B
C
D
A Peak load boiler
B Buffer tank
C Heating circuit
D Hot water tank
12.1.3 Heating system variant 1.1 –
1 neoTower, 1 buffer tank, peak load boiler connected to buffer tank via hydraulic separator
A
F
E
B
C
D
A Peak load boiler
B Buffer tank
C Heating circuit
D Hot water tank
E Hydraulic separator
F Gravity brake