12. Appendix
12.1
Checklist for commissioning and recommissioning
Note:
You must carefully read the instructions in the operating manual, in particular the safety
instructions, and observe them before putting the automatic feeder into service.
Commissioning
OK?
Tell end users that the automatic feeder must be installed so that it is frost-proof.
Tell end users that the automatic feeder must be protected from rain and moisture.
Tell the end user that the water should be of drinking water quality. Excessive calcium
and/or iron and/or manganese concentrations may cause premature wear.
Tell end users that the feeder and cables must be protected against exposure to sun-
light.
Set up the automatic feeder on an even surface.
Electrically ground the automatic feeder.
Connect water supply.
Install the feeding station.
Install suction hoses.
Install the suction hose bracket for cleaning.
Install safety grid for the powder hopper attachment.
Fill MP container.
Connect power supply.
Switch on automatic feeder.
Fill boiler with water.
New installation.
Perform the cleaning.
Set the target temperature of the heating system
Set the portion sizes.
Setting the portion sizes
OK?
Boiler temperature
MP
Boiler water