37
6. Operation
Fig. 26: Pull throttle handle
6.2
Working with the tamper
6.2.1
Tamping (sleeper)
Avoid contact with the sleeper!
•
Place the tamping tool approx. 1 to 5 cm
next to the sleeper.
•
Do not touch the sleeper with the tamping
tool while tamping.
Apply force ergonomically!!
•
While tamping, use the weight of the up-
per part of your body to apply the vertical
force, this will relieve the backbone.
1.
Hold the tamper upright and place it next to the sleeper.
2.
Press down the throttle handle by hand.
The tamping tool starts to vibrate.
3.
Continue holding the tamper by the handles and apply
force by using the weight of the upper part of the body.
4.
Dive vertically into the ballast until the tip of the tamping
tool is located approx. 5 to 10 cm below the bottom of the
sleeper, see figure.
Summary of Contents for 62.05L
Page 1: ...1 Content OPERATING MANUAL ROTAMP LIGHT 62 05L Vers 02 Vertical tamper ...
Page 73: ...73 11 Appendix 11 Appendix Fig 66 EC Declaration of Conformity EC Declaration of Conformity ...
Page 74: ...Content 目录 1 产品说明书 ROTAMP LIGHT 62 05 L 版本 02 立式捣固机 ...
Page 79: ...目录 6 ...
Page 96: ...4 机器简介 23 4 4 汽油发动机 图 2 汽油发动机 1 反冲起动器手柄 2 燃油箱 3 发动机停止 按钮 4 离心式离合器 5 油门杆 ...
Page 109: ...5 机器准备 36 图 22 油箱加油 1 油箱盖 2 燃料上限 3 燃油箱 ...
Page 113: ...6 操作 40 图 27 捣固机具与轨枕间距 5 将捣固机拉向操作人员 以便将道碴压实在轨枕之下 图 28 压实轨枕下的道碴 距离 1 5 厘米 距离 5 10 厘米 ...
Page 133: ...9 保养维护 60 图 41 燃油管 1 燃油管 1 每年或每 200 个运行小时更换燃油管 2 如果在检查过程中发现任何泄漏 应立即更换燃油管 ...
Page 142: ...9 保养维护 69 4 准备注入 图 54 拆下保护盖 图 55 固定转接器 拧下混合管 缩短混合管 ...
Page 143: ...9 保养维护 70 5 在捣固机具上放置辅助板 并将注射针管插入辅助板 图 56 将辅助板放置在捣固机具上 图 57 将注射针管插入辅助板 ...