4
Part no. 209-1397 09/20/2021
Craft Series Engineered Stone Top
© 2021 Robern, Inc. 701 N. Wilson Ave. Bristol, PA 19007 U.S.A.
800.877.2376
www.robern.com
1
2
CHESTNUT HILL 24 / SENDAI 24
NOTE:
The installation of a top on a Chestnut Hill 24 and Sendai 24 vanity does not require mounting hardware.
1. Install the drain assembly to the sink. Refer to the drain manufacturer's instructions.
2. Install the faucet to the stone top. Refer to the faucet manufacturer's instructions.
3. Apply a 1/4" (6mm) bead of silicone sealant on the inner ledge of the vanity and lower the sink onto the silicone sealant.
NOTE
: Refer to page 1 dimensions for bowl location distance from wall.
3