6
Part no. CB-209-1441 06/15/2022
Murray Hill Cabinet
© 2022 Robern, Inc. 701 N. Wilson Ave. Bristol, PA 19007 U.S.A.
800.877.2376
www.robern.com
MOUNT THE FRAME
NOTE:
The frame comes wrapped in a protective film. Partial removal of the protective film will protect the frame during installation and
make removal easier at the end of installation.
1. Insert the frame into the rough opening. Square and plumb the frame, shimming as needed to hold it's position in the opening.
2. Holding a level to the frame, attach the frame to one side of the rough-in using the included flat head screws [203-1435]. Shim
behind the screw locations to avoid overtightening the screws.
Pro tip:
Add a layer of masking tape to the level to avoid scratching the frame surfaces.
3. Insert and tighten the opposite hand upper and lower screws to level the frame. Shim behind the screw locations to avoid
overtightening the screws.
4. Holding a level to the frame, insert and tighten the remaining screws. To avoid overtightening and potentially damaging the frame,
shim behind the remaining screw locations as required.
2
3
4