13
© 2019 Robern, Inc. 701 N. Wilson Ave. Bristol, PA 19007 U.S.A.
800.877.2376
www.robern.com
Installation instructions
Part no. 209-1311-rA rev. 06/13/19
Uplift Tech Cabinet
7. Install back mirrors in cabinet.
7a. Remove 4 screws securing right hand ceiling, and place aside.
7b. Position right hand mirror into cabinet and reinstall ceiling.
Note: for 24" cabinets, skip to step 8 (shelf clip install).
7c. Remove 4 screws securing left hand ceiling, and place aside.
7d. Position left hand mirror into cabinet and reinstall ceiling.
STEP 3 - FINAL ASSEMBLY
7b
7c
7a
7d