5
© 2019 Robern, Inc. 701 N. Wilson Ave. Bristol, PA 19007 U.S.A.
800.877.2376
www.robern.com
Installation instructions
Part no. 209-1311-rA rev. 06/13/19
Uplift Tech Cabinet
3. Remove the four screws to lower the right hand top ceiling panel inside the cabinet.
3a. This will give access to the electrical connection box.
4. Continue to page 10 for Electrical Connections.
5. Place cabinet in rough-in and make sure cabinet is plumb and level. If cabinet is not plumb, use supplied shims.
6. Install four screws (SS674) followed by the screw caps (SS672) as shown. Insert the hole plugs (SS134) into the remaining four
holes.
7. Go to page 12 for final assembly.
STEP 1A - RECESS MOUNTING
3
5
3a
6
CB-211-1305
QTY: 6
CB-SS672
QTY: 6
CB-SS134
QTY: 6
CB-SS136
QTY: 2
CB-203-1349
QTY: 12
CB-SS674
QTY: 12
CB-SS712
QTY: 8
CB-203-1126
QTY: 6
CB-216-1188 HARDWARE BAG
CB-211-1305
QTY: 6
CB-SS672
QTY: 6
CB-SS134
QTY: 6
CB-SS136
QTY: 2
CB-203-1349
QTY: 12
CB-SS674
QTY: 12
CB-SS712
QTY: 8
CB-203-1126
QTY: 6
CB-216-1188 HARDWARE BAG
CB-211-1305
QTY: 6
CB-SS672
QTY: 6
CB-SS134
QTY: 6
CB-SS136
QTY: 2
CB-203-1349
QTY: 12
CB-SS674
QTY: 12
CB-SS712
QTY: 8
CB-203-1126
QTY: 6
CB-216-1188 HARDWARE BAG
[SS134]
[SS672]
[SS674]