6
© 2019 Robern, Inc. 701 N. Wilson Ave. Bristol, PA 19007 U.S.A.
800.877.2376
www.robern.com
Installation instructions
Part no. 209-1311-rA rev. 06/13/19
Uplift Tech Cabinet
These instructions are for surface mounting your cabinet, supplied with surface side kit (USMK27D6P)
1. See below for location and dimension of specific model and electric rough-in.
2. Locate and drill four 3/16" holes through the indent line on the mounting bar into the wall. Be sure the mounting bar is level. Make
sure Z mounting bar is centered.
3. Use four #10 X 2" screws (SS674) provided to attach the Z bar mounting strip to the wall. You can pre-drill a 3/32" hole in the stud.
STEP 1B - SURFACE MOUNTING
49” ( 1245mm)
MINIMUM FROM FINISHED CEILING
MINIMUM DU PLAFOND FINI
MÍNIMO DESDE E
L
TECHO
ACABADO
46 (
1168mm
)
SUGGESTED FROM FINISHED FLOOR
SUGGÉRÉ DU PLANCHER FINI
SUGERIDO DESDE E
L PISO
ACABADO
1
19-1/8
"
(485mm)
Field wiring
Product
27
"
(686mm)
25-7/8
"
(657mm)
25-1/2
"
(648mm)
Product
UC2748 = 48
"
(1219mm)
UC2736 = 36
"
(914mm)
UC2730 = 30
"
(762mm)
26-1/4
"
(667mm)
2
3
26-7/8
"
(683mm)
Z Bar
SS674
1" x 3"