SECTION 16: O
PERATION
AND
M
AINTENANCE
71 of 83
SECTION 16: OPERATION AND MAINTENANCE
The heater is eq
u
ipped
w
ith a direct-spark ignition
system.
16.1 Se
q
uence of Operation
1. T
u
rn the thermostat
u
p. When the thermostat
calls for heat, the p
u
mp
w
ill start immediately.
After a short period, the b
u
rners
w
ill begin their
ignition seq
u
ence. Sparking
w
ill begin at the
electrodes and the gas
v
al
v
e
w
ill be energized
45 seconds later.
2. The flame
w
ill be sensed by the flame sensing
rod and the electrode is de-energized.
3. If a flame is detected, the gas
v
al
v
e
remains open. When the call for heat is
satisfied, the b
u
rner sh
u
ts off. On CRV-Series
systems eq
u
ipped
w
ith the optional ROBERTS
GORDON
®
System Control, or ROBERTS
GORDON
®
ULTRAVAC
™
, the p
u
mp
w
ill
contin
u
e operation for a post-p
u
rge period of
t
w
o min
u
tes.
4. If no flame is detected, the mod
u
le
w
ill close and
a p
u
rge period begins. If a flame is not
established, a second p
u
rge and
w
arm-
u
p
w
ill
take place and then a third trial cycle
w
ill begin.
After three trials, the mod
u
le
w
ill locko
u
t for one
ho
u
r or
u
ntil reset.
5. A reset is accomplished by remo
v
ing po
w
er
from the mod
u
le for at least 5 seconds
(thermostat cycle is req
u
ired) or a
u
tomatically
after 1 ho
u
r.
16.2 To Shut Off Heater
Set thermostat to lo
w
est setting.
T
u
rn OFF electric po
w
er to heater.
T
u
rn OFF man
u
al gas
v
al
v
e in the heater s
u
pply line.
16.3 To Start Heater
T
u
rn gas
v
al
v
e and electric po
w
er OFF and
w
ait fi
v
e
min
u
tes for
u
nb
u
rned gases to
v
ent from heater.
T
u
rn ON main gas
v
al
v
e.
T
u
rn ON electric po
w
er.
Set thermostat to desired temperat
u
re.
B
u
rner sho
u
ld light a
u
tomatically.
16.4 Pre-Season Maintenance and Annual
Inspection
To ens
u
re yo
u
r safety and years of tro
u
ble-free
operation of the heating system, ser
v
ice and ann
u
al
inspections m
u
st be done by a contractor q
u
alified in
the installation and ser
v
ice of gas-fired heating
eq
u
ipment.
T
u
rn off gas and electric s
u
pplies before performing
ser
v
ice or maintenance. Allo
w
heater to cool before
ser
v
icing.
Before e
v
ery heating season, a contractor q
u
alified in
the installation and ser
v
ice of gas-fired heating
eq
u
ipment m
u
st perform a thoro
u
gh safety
Cut/Pinch Hazard
Wear protective gear
during installation,
operation and service.
Edges are sharp.
WARNING
Failure to follow these instructions can result in death, electric shock, injury or property damage.
Burn Hazard
Allow heater to cool
before service.
Tubing may still be hot
after operation.
Explosion Hazard
Turn off gas supply to
heater before service.
DANGER
Electrical Shock Hazard
Disconnect electric
before service.
More than one
disconnect switch may
be required to
disconnect electric from
heater.
Heater must be
connected to a properly
grounded electrical
source.
Summary of Contents for CoRayVac CRV-B-10
Page 2: ......
Page 4: ......
Page 6: ......
Page 71: ...SECTION 13 STARTING THE SYSTEM 65 of 83 FIGURE 42 Vacuum Reading ...
Page 81: ...SECTION17 TROUBLESHOOTING 75 of 83 17 1 Troubleshooting Flow Chart ...
Page 90: ......
Page 91: ......
Page 92: ......
Page 93: ......
Page 94: ......