SECTION 9: P
UMP
I
NSTALLATION
AND
V
ENTING
43 of 85
FIGURE 27: Vertical Ventin
g
Confi
g
uration
6 (15 cm) for EP-100 and EP-200
20 (51 cm) for EP-300
Bird Screen
Optional
NOTE:
V
acuum loss
may occur when
using vent caps.
The use of
b
ird screen
to cover vent terminations
is recommended.
Part Number
Description
Part Number
Description
01330203
Tee, 4" (10 cm) Aluminized
91412801
Flexible Boot, 4.5" (11 cm)
01330204
Tee, 6" (15 cm) Aluminized
91412802
Flexible Boot, 6" (15 cm)
01335801
Elbow, 4" (10 cm) Aluminized 90°
91901300
Boot Clamp, 4" (10 cm)
02718851
Drain Cap, 4" (10 cm)
91913703
Boot Clamp, 6" (15 cm)
02718852
Drain Cap Assembly, 6" (15 cm)
T0100320
Elbow, 6" (15 cm) Aluminized 90°
01327002
Condensate Neutralization Tube 200
01365400
Bird Screen 4" (10 cm)
01327003
Condensate Neutralization Tube 600
01397400
Bird Screen 6" (15 cm)
01327004
Condensate Neutralization Tube 1000
01335901
Alumized U-Tube 4" (10 cm)
01327005
Condensate Neutralization Tube 2000
91906900
Silicone Ring
90502300
Vent Cap, 4" (10 cm) Metalbestos
90502302
Vent Cap, 6" (15 cm) Metalbestos
Summary of Contents for Corayvac CRV-B Series
Page 2: ......
Page 4: ......
Page 5: ......
Page 6: ......
Page 8: ......
Page 73: ...SECTION 13 STARTING THE SYSTEM 65 of 85 FIGURE 48 Vacuum Reading ...
Page 84: ...CRV SERIES INSTALLATION OPERATION AND SERVICE MANUAL 76 of 85 18 1 Troubleshooting Flow Chart ...
Page 85: ...SECTION18 TROUBLESHOOTING 77 of 85 Troubleshooting Flow Chart ...
Page 92: ...CRV SERIES INSTALLATION OPERATION AND SERVICE MANUAL 84 of 85 ...
Page 93: ...SECTION 21 THE ROBERTS GORDON CORAYVAC LIMITED WARRANTY 85 of 85 2017 ...
Page 94: ......
Page 95: ......
Page 96: ......