APPLICATIONS, ENGINEERING AND DETAILED GUIDANCE ON SYSTEMS DESIGN, INSTALLATION AND PRODUCT PERFORMANCE IS AVAILABLE UPON REQUEST. ROBERTS GORDON
®
PRODUCTS ARE TO BE
INSTALLED ONLY IN ACCORDANCE WITH LOCAL LAWS, CODES AND REGULATIONS, AND ONLY BY A CONTRACTOR QUALIFIED IN THE INSTALLATION AND SERVICE OF GAS-FIRED HEATING EQUIPMENT.
HEATER INSTALLATION
Critical Hanger Placement
Hanger
Side View
Must Be Within 4" (10 cm)
Front View
S Hooks
Reflector
Hanger
45° Angle
* Allows for thermal expansion of system
Typical Suspension Details
Rod (3/8")
Beam Clamp
Concrete Beam
Wood Beam
Washers
Locknut
Screw Hook
(3/8")
24" min.*
(61 cm)
X*
Anchor
S Hooks
Chain size
3/16" minimum
Turnbuckle
Not Included
Description
Part Number
S-Hook
91907302
Tube/Reflector Hanger
03090100
Run Length
Typical Expansion
Minimum “X” Length
10’ - 50’
±1” (3 cm)
12”
51’ - 60’
±2” (5 cm)
18”
61’ - 70’
±3” (8 cm)
24”