7
Feed glazing rubber into each glazing bar and
trim to length. Notice that some channels are
only used on a partition. Applying a lubricant to
the aluminium channels will speed up insertion.
The frame is assembled by feeding square
headed bolts, either 10mm or 15mm in length
into the slots on glazing bars and then locating
those bolts through holes in purlings and cills,
etc… Twist in (rectangular) crop headed bolts
are also used towards the end of construction
to attach components to the frame when the
glazing bar slots are no longer exposed at the
ends.
10mm
15mm
Summary of Contents for 5ft Wide LEAN-TO
Page 9: ...9 D604 TRANSIT BOLT ON DIAGONALS 15mm D604 15mm D609 10mm D609...
Page 14: ...14 EQUAL...
Page 16: ...16 D234 EQUAL D234...
Page 19: ...19 D862 D862 D863L 2 2 2 2 2 FLIP VIEW D119 CUT 6mm SILICONE...
Page 21: ...21 D1216 GLASS D1208 GLASS D1216 GLASS...
Page 26: ...26 D220 D220...
Page 27: ...27 D079 D862...
Page 29: ...29 D845 D864 D084 D083 15 4 N A 4 D864 D670 D163 D675 15 4 N A 4...
Page 30: ...30 D860 D087 D860 1 D087 1 Part No Quantity D860 D087...
Page 32: ...32 O7mm...
Page 38: ...38...
Page 39: ...39...