8
plied with the chimney hood.
IN THE EXTRACTION MODE:
a. Place the anti-backflow flats
item 8
over the round outlet
item 6,
the telescopic duct
and connect the
ducting 150mm (6 INS) over the round outlet on top of the canopy and secure the connections with
appropriate clamping rings or adhesive tape (
Fig. 6
).
b. Remove the grease filters (see paragraph Maintenance)
Fig. 5
being sure that the connector of the
mains cable is correctly inserted in the socket placed on the sides of the fan. Before fitting the chimney
to the canopy make the electrical connection as described in the section titled ELECTRICAL. When
the electrical connection has been made, test the lights and the fan motor.
c. Each chimney stack consists of two sections. Fit the upper sections (
Fig. 1 - item 7a & b
) first by
expanding the chimneys slightly to allow them to clamp around the bracket item 2 and secure the
chimney stacks to the brackets using the two M4 screws
item 12c
provided. Fit the lower chimney
sections by expanding the chimneys slightly to allow them from the top of the canopy to clamp around
the upper chimney sections.
d. Fit the deflector
Item 9.
IN THE RECIRCULATION MODE:
a. Fit the recirculation spigot
R
onto the upper chimney wall bracket using the same fixing screws (
Fig.
2 item 2
).
b. Connect the ducting 150mm (6 INS) not provided between motors
item 6
and the recirculation spigot
and secure the connections with appropriate clamping rings or adhesive tape.
c. Remove the grease filters (see paragraph Maintenance)
Fig. 5
being sure that the connector of the
feeding cable is correctly inserted in the socket placed on the side of the fan. Before fitting the chimney
to the canopy make the electrical connection as described in the section titled ELECTRICAL. When
the electrical connection has been made, test the lights and the fan motor.
d. Insert the charcoal filter into the base of the motor housing and secure the filter with two metal secur
-
ing straps
item A
as illustrated in
Fig. 4
.
e. Each chimney stack consists of two sections. Fit the upper sections (
Fig. 1 - item 7a & b
) first by
expand-ing the chimneys slightly to allow them to clamp around the bracket item 2 and secure the
chimney stacks to the brackets using the two M4 screws
item 12c
provided. Fit the lower chimney
sections by expanding the chimneys slightly to allow them from the top of the canopy to clamp around
the upper chimney sections.
f. Fit the deflector
Item 9.
GB
Summary of Contents for VISTA MURALE
Page 35: ......
Page 38: ...40 Composants Components Bauelemente Componenti Componentes Onderdelen 2 R 8 4 6 9 7 5 ...
Page 39: ... 0 0 4 170 113 6 260 40 293 670 200 DESSOUS HOTTE PLAN TRAVAIL ...
Page 40: ... 4 5 748 438 min max 1480 1201 898 359 285 40 164 50 56 4 0 5 122 465 150 400 35 719 ...
Page 41: ... 2 2 1 84 670 293 40 ...
Page 42: ...4 3 4 10 10 30 1070 260 4 A ...
Page 43: ...41 5 6 6 R 7a 7b ...
Page 44: ... 2 ACCESSOIRES ACCESSORI ACCESSORIES ACCESORIA ZUBEHÖRE ACCESSOIRES 13MC070 323 x 262 x 8 mm ...
Page 46: ... 4 Beleuchtung Lighting Eclairage Luci Luz Verlichting ...
Page 47: ......