background image

2

3

4

5

5

1

1

1

2

3

4

5

Left turns

Right turns

20cm

90°

45°

6

7

8

9

10

11

12

13

14

15

16

18

17

Wire Setup

Chapter numbers mentioned in this Guide refer to the Operating & Safety Manual

Carefully read and review all safety instructions, 
warnings and cautions contained in the 
Operating & Safety Manual.

Main Zone

Main Zone

Sub-Zone

1

Separated Zone

A

What Does Your Lawn Look Like?

Chap. 3.1

Chap. 3.1.1

Chap. 3.1.2, 4.3.3

Chap. 3.1.3

Base Station Location

Chap. 3.2

Wire Direction & Distance

Chap. 4.2.1

Corners

Chap. 4.2.2

Avoid slopes

Chap. 4.2.2

20cm from edge

28cm from wall

Obstacles Inside Lawn

Chap. 3.4.1

Hard obstacle

Chap. 4.3.1

Soft obstacle

Chap. 4.3.2

Both wires under 

same peg

Leave 30cm

at starting point

Max 15m

Min 3m

Base Station Installation

Power Box Installation

Finish

Chap. 4.5

Connect the wire

Connect the Plot Connector

Chap. 4.6

Insert 2 Pegs

Chap. 4.6

One-Time Setup

10

9

11

Mount 

Bracket

Connect 

15cm extension cable

Chap. 4.6

Chap. 4.7

Chap. 4.7

Turn Safety Switch ON

Operating Panel

Chap. 5.2.1

Choose Measurements Units

Chap. 5.2.2

Scroll

Choose / Confirm

Scroll

Back / Cancel

Meter

Celsius

24 Hours

Foot

Fahrenheit

12 hours (AM / PM)

Set Day & Time

Chap. 5.2.3

Set Lawn Size

Chap. 5.2.4

Peg Base

Chap. 5.2.5

Press OK

Test Base Station Position

Chap. 5.2.5

Press OK

Possible Error 

Messages:

Confirm steps 7,10,11

Swap wires in 

plot connector

Reposition 

Base Station

Press OK

Anti

Clockwise

Reviews: