2
3
4
5
5
1
1
1
2
3
4
5
Left turns
Right turns
20cm
90°
45°
6
7
8
9
10
11
12
13
14
15
16
18
17
Wire Setup
Chapter numbers mentioned in this Guide refer to the Operating & Safety Manual
Carefully read and review all safety instructions,
warnings and cautions contained in the
Operating & Safety Manual.
Main Zone
Main Zone
Sub-Zone
1
Separated Zone
A
What Does Your Lawn Look Like?
Chap. 3.1
Chap. 3.1.1
Chap. 3.1.2, 4.3.3
Chap. 3.1.3
Base Station Location
Chap. 3.2
Wire Direction & Distance
Chap. 4.2.1
Corners
Chap. 4.2.2
Avoid slopes
Chap. 4.2.2
20cm from edge
28cm from wall
Obstacles Inside Lawn
Chap. 3.4.1
Hard obstacle
Chap. 4.3.1
Soft obstacle
Chap. 4.3.2
Both wires under
same peg
Leave 30cm
at starting point
Max 15m
Min 3m
Base Station Installation
Power Box Installation
Finish
Chap. 4.5
Connect the wire
Connect the Plot Connector
Chap. 4.6
Insert 2 Pegs
Chap. 4.6
One-Time Setup
10
9
11
Mount
Bracket
Connect
15cm extension cable
Chap. 4.6
Chap. 4.7
Chap. 4.7
Turn Safety Switch ON
Operating Panel
Chap. 5.2.1
Choose Measurements Units
Chap. 5.2.2
Scroll
Choose / Confirm
Scroll
Back / Cancel
Meter
Celsius
24 Hours
Foot
Fahrenheit
12 hours (AM / PM)
Set Day & Time
Chap. 5.2.3
Set Lawn Size
Chap. 5.2.4
Peg Base
Chap. 5.2.5
Press OK
Test Base Station Position
Chap. 5.2.5
Press OK
Possible Error
Messages:
Confirm steps 7,10,11
Swap wires in
plot connector
Reposition
Base Station
Press OK
Anti
Clockwise