40
41
Test Base
Station Position
C. Test Base Station Position
Place the mower on the lawn, 3 m (10 ft) in front of the
entrance to the Base Station, facing the Perimeter Wire, and
press GO to start the test.
TIPS
To restart the setup
at any time, press and
hold STOP + down
arrow together for at
least 4 seconds.
Set Time
Set Time
OK
13
: 45