ENG
INFORMATION ON HANDLING AND INSTALLATION
66
4.7. MACHINE UNDERGROUND INSTALLATION
Dig a pitch in the floor to insert the template (C) and fix it with a concrete casting.
The template (C) is supplied on request (Optional).
Important
The depth (X) must be equal to the machine base height.
Rotoplat 308-508-708
4.8. RECOMMENDATIONS FOR CONNECTIONS
Important
The connections must be made in accordance with the specifications supplied by the Manufacturer in
the enclosed diagrams. The person authorised to carry out said operation must have the skills and
experience acquired and acknowledged in the specific sector, must perform the connection in
accordance with the best practice and take into account all the regulatory and legislative requirements.
Once the connection has been completed, before commissioning the machinery, it is necessary to
perform an overall check to verify if said requirements have been complied with.
4.9. PNEUMATIC CONNECTION
1.
Insert a flexible hose in the end of the hose barb fitting and fasten it with a metallic screw clamp (A).
2.
Check that the valve (B
) is in the “OPEN” position.
3.
Activate the supply line pressure.
4.
Check that the pressure gauge indicates at least 6 bar and use the knob (C) to compensate any pressure
difference.
Repeat this operation when the machine is running.
Rotoplat LP 308-508-708
Rotoplat TP3 308-508-708