First start-up
30
5
P02
Gas type selection
WARNING: before changing the parameter value, read the instructions in Para-
graph 5.6
0 - 1
0
0 = G20, G25, G25.3
1 = LPG, G30, G31
P03
Heating temperature setting
0 - 1
0
0 = standard (30-80 °C)
1 = reduced (25-45 °C)
P04
Heating run-up
It is possible to set the time, during the start-up phase, that the boiler takes to
reach the maximum set power (for the space heating service).
0 - 5
1
0 = disabled
1 = 50 s
2 = 100 s
3 = 200 s
4 = 400 s
5 = 600 s
P05
Primary ignition time of a single unit
Time for which a single unit becomes primary at startup, after which the automat-
ic changeover with the other unit takes place.
0 - 255
50
Value in hours
P06
Switching off a single unit
1 - 3
3
1 = only master on
2 = only slave on
3 = both on
P07
Heating timing
You can set the minimum time in which the burner is kept off once the heating
temperature has reached the setpoint.
0 - 90
36
Value in multiples of 5 s (default 36 x 5
= 180 s)
P08
Post-circulation heating timing
It is possible to set the operating time of the pump, in heating mode, after the
main burner has been switched off due to the intervention of the room thermo-
stat.
0 - 90
36
Value in multiples of 5 s (default 36 x 5
= 180 s)
P12 (1)
Heating blower minimum speed adjustment
It is possible to set the minimum speed of the fan for the heating service, which
corresponds to the minimum power of the burner during a heating request (see
Figure 5.7
p. 31). The value is preset according to the set power (parameter P00)
and the type of gas (parameter P02).
45 - P13
--
Value in hertz (1 Hz = 30 RPM)
P13 (1)
Heating blower maximum speed adjustment
It is possible to set the maximum speed of the fan for the heating service, which
corresponds to the maximum power of the burner during a heating request (see
Figure 5.7
p. 31). The value is preset according to the set power (parameter P00)
and the type of gas (parameter P02).
P12 - 203
--
Value in hertz (1 Hz = 30 RPM)
P14 (1)
Starting step adjustment
It is possible to set the fan speed during the start-up phases. The value is preset
according to the set power (parameter P00) and the type of gas (parameter P02).
P10 - 203
--
Value in hertz (1 Hz = 30 RPM)
P16
Setting the climate curve (only with outdoor probe connected)
An outdoor temperature probe may be connected and acts by automatically
changing the delivery temperature according to the measured outdoor temper-
ature. The extent of the correction depends on the set Kd heating control value
(see Figure 5.6
p. 31). The choice of the curve is determined by the maximum
delivery temperature Tm and the minimum outdoor temperature Te, taking into
account the degree of insulation of the house. The values of the delivery tempera-
tures Tm refer to standard systems 30-80 °C or floor systems 25-45 °C. The type of
system can be set using parameter P03.
0 - 30
15
The numbering of the value corre-
sponds to the 'Kd' curves of the graph
(see Figure 5.6
P18
0-10 V industrial bus drive enable
The 0-10 V industrial bus input can be enabled or disabled to set burner power or
delivery temperature via the external bus.
0 - 2
0
0 = disabled
1 = temperature control mode
2 = power control mode
P19
Min heating setpoint
It is possible to set the minimum user-adjustable heating temperature.
20 - 40
30
Value in °C
P20
Max heating setpoint
It is possible to set the maximum user-adjustable heating temperature.
40 - 90
85
Value in °C
P22
∆T delivery-return setpoint
It is possible to set the temperature difference between delivery and return.
0
10 - 40
20
0 = disabled
Value in °C
P23
Modulating pump minimum speed
It is possible to set the minimum speed value of the modulating pump during a
request for space heating operation.
50 - 70
60
Value in percentage
P24
Modulating pump maximum speed
It is possible to set the maximum speed value of the modulating pump during a
request for space heating operation.
70 - 100
100
Value in percentage
P25
Control period of ∆T flow/return
Expresses the response time to pump modulation.
20 - 100
30
Value in seconds
P26
Modbus address
Not used
P27
Percentage of activation of the secondary unit
60 - 100
85
Value in percentage
P28
Percentage of deactivation of the secondary unit
5 - 40
10
Value in percentage
P30
Temperature measurement unit setting
0 - 1
0
0 = °C
1 = °F
P33
Modbus communication baud rate
Not used