ACF60-00 – Installation, User’s and Maintenance Manual
6
Ed. 04/2012
Natural gas equipment
Electrically powered equipment
Any other standard that regulates the installation of air conditioning devices with gaseous
fuel.
It excludes the manufacturer from any contractual and non contractual obligations
for damages caused to people, animals, or things due to incorrect installation and
improper use of the ACF and also by not observing the indications and instructions
provided by the manufacturer.
Once the appliance is installed
The installer must provide the owner with a Declaration stating that the installation has
been completed in compliance with state-of-the-art practices, current national and local
regulations, and recommendations by the manufacturer.
Before contacting your authorised Robur Technical Assistance Centre (TAC) for the ini-tial
activation, the firm must ensure that:
•
that the electric and gas supply ratings are the same as those on the data plate
•
the gas supply system and the water distribution system are sealed
•
the gas supplied to the appliance is of the type for which it is designed
•
the pressure of the gas supplied falls within the range of values specified by the
manufacturer
•
the gas and electricity supply systems are correctly rated for the capacity required by
the appliance and that they are equipped with all safety and control devices
prescribed by current regulations.
Check that no safety and control devices are excluded, by-passed or not properly
working.
First start-up procedure
The entire procedure for the first activation of the appliance must be carried out
exclu-sively by an authorized Robur Technical Assistance Centre (TAC) and according to
the instructions supplied by the manufacturer.
To carry out entire procedure correctly, follow the instructions in Paragraph “INITIAL
STARTUP AND ADJUSTING” page 73.
Contact your local Authorised Robur Technical Assistance Centre (TAC). To find
out who your local TAC is, contact Robur S.p.A. (tel. +39 035 888.111).
The
guarantee could be voided if the initial activation is not carried out (and
validated) by a Robur TAC.
Summary of Contents for GA ACF60-00
Page 4: ......
Page 6: ...ACF60 00 Installation User s and Maintenance Manual 2 Ed 04 2012 ...
Page 56: ...ACF60 00 Installation User s and Maintenance Manual 52 Ed 04 2012 ...
Page 86: ...ACF60 00 Installation User s and Maintenance Manual 82 Ed 04 2012 ...
Page 91: ...APPENDIX Ed 04 2012 87 APPENDIX DECLARATION OF CONFORMITY ...
Page 92: ...ACF60 00 Installation User s and Maintenance Manual 88 Ed 04 2012 ...
Page 93: ...APPENDIX Ed 04 2012 89 ...
Page 94: ...ACF60 00 Installation User s and Maintenance Manual 90 Ed 04 2012 ...
Page 95: ......