OPERATION AND INSTALLATION
RCI-4100 SYSTEM
MAN-1111 Rev H
©Copyright 2015 LSI-Robway Pty Ltd
Page 72
9.1.6.
The approximate physical location on the plant of each item of electrical equipment to be
installed, and the proposed routing of any interconnecting cables. Where interconnecting
cables cross a zone boundary, care must be taken to ensure that such a crossing is
permitted, and if so, what additional requirements are placed on the cable installation. Refer
to the system overview drawing in the rear of the manual for component identification.
9.1.7.
Any cable identification detail. All cables containing Intrinsically Safe (IS) circuits must be
identified as such, either by a form of physical marking, or by the use of blue sheathing.
9.1.8.
Inspection check lists against which commissioning and routine inspections should be
carried out. Refer to the checklists on Section 9.4. “Inspection and Test Schedule”.
9.1.9.
Details of electrical testing required at commissioning and inspections. Should there be an
operational problem, there may be electrical testing required. Refer to the Trouble shooting
section.
9.1.10.
A record of any modifications and the justification for each modification. If such modifications
were present as supplied by LSI-Robway, then such a justification will accompany the
system. Where these modifications were performed by a party other than LSI-Robway,
these justifications must be supplied by those responsible for such modifications. LSI-
Robway takes no responsibility for modifications done to the system that have not been
authorised by LSI-Robway in written form.
9.1.11.
Details of any previous inspections. This generally will not be applicable, but is included for
the sake of completeness.
9.1.12.
Check the gas group requirements.
9.2. Post-installation
Following the initial installation of the system into a Hazardous Area, the equipment and installation
shall undergo a Detailed Inspection to ensure;
•
The suitability for the hazardous area in which it is installed,
•
That it complies with the relevant system documentation, and
•
That no obvious damage has occurred during installation.
Refer to the Detailed Inspection column on Section 9.4. “Inspection and Test Schedule”.
9.3. Post-commissioning
Following commissioning, there are three levels of inspection required by the standard, these being:
9.3.1.
Detailed Inspection
A Detailed Inspection should be performed on the equipment and installation at the following times:
•
Following commissioning of any new system,
•
Following any modification or repair to the system to ensure the continued suitability of the
system, and
•
Following any change in area classification or process change on a plant to ensure the safety
requirements remain valid.
Detailed Inspections should be performed in accordance with the "Detailed" column on Section 9.4.
“Inspection and Test Schedule”, and is used to ensure the same level of safety determined by the
Post-Installation Inspection.
Summary of Contents for RCI-4100
Page 2: ......
Page 6: ......
Page 8: ......
Page 28: ......
Page 36: ......
Page 58: ......
Page 70: ......
Page 82: ......
Page 88: ......
Page 92: ......
Page 94: ......
Page 100: ......
Page 102: ......
Page 104: ......
Page 106: ......
Page 108: ......
Page 110: ......
Page 112: ......
Page 114: ......
Page 126: ......
Page 128: ......
Page 130: ......
Page 132: ......
Page 140: ......
Page 142: ...WIND SPEED MONITORING OPTION MAN 1111 Rev H Copyright 2015 LSI Robway Pty Ltd Page 142 ...
Page 144: ......
Page 147: ...WIND DIRECTION MONITORING MAN 1111 Rev H Copyright 2015 LSI Robway Pty Ltd Page 147 ...
Page 148: ......
Page 150: ......
Page 156: ......
Page 158: ......
Page 162: ...TILT SENSING OPTION MAN 1111 Rev H Copyright 2015 LSI Robway Pty Ltd Page 162 ...
Page 164: ......
Page 170: ......
Page 171: ...SYSTEM DRAWINGS MAN 1111 Rev H Copyright 2015 LSI Robway Pty Ltd Page 171 ...
Page 172: ...SYSTEM DRAWINGS MAN 1111 Rev H Copyright 2015 LSI Robway Pty Ltd Page 172 ...
Page 173: ...SYSTEM DRAWINGS MAN 1111 Rev H Copyright 2015 LSI Robway Pty Ltd Page 173 ...
Page 174: ...SYSTEM DRAWINGS MAN 1111 Rev H Copyright 2015 LSI Robway Pty Ltd Page 174 ...
Page 175: ...SYSTEM DRAWINGS MAN 1111 Rev H Copyright 2015 LSI Robway Pty Ltd Page 175 ...
Page 176: ...SYSTEM DRAWINGS MAN 1111 Rev H Copyright 2015 LSI Robway Pty Ltd Page 176 ...
Page 177: ...SYSTEM DRAWINGS MAN 1111 Rev H Copyright 2015 LSI Robway Pty Ltd Page 177 ...
Page 178: ...SYSTEM DRAWINGS MAN 1111 Rev H Copyright 2015 LSI Robway Pty Ltd Page 178 ...
Page 179: ...SYSTEM DRAWINGS MAN 1111 Rev H Copyright 2015 LSI Robway Pty Ltd Page 179 ...
Page 180: ......
Page 182: ......