9.4. Inspection and Test Schedule
Check that
Detailed
Periodic
Visual
1
System or equipment is appropriate to area
classifications
A
A
A
2
Are there any modifications.
A
S
A
3
System group is correct.
A
S
N
4
Equipment temperature class is correct.
A
S
N
5
Equipment or system is clearly marked, and
particularly that any equipment or cable labels
are legible.
A
S
N
6
Equipment or system carries the correct
identification.
A
S
N
7
There are no unauthorised modifications to type
and rating of fuses.
A
S
A
8
Relays are of correct type and without damage.
A
A
A
9
Segregation is maintained between Intrinsically
Safe and Non-Intrinsically Safe circuits in any
junction boxes or similar.
A
A
A
10
Cabling is installed in accordance with the
documentation.
A
N
N
11
Cable screens are earthed in accordance with
the documentation. This may be difficult when
the screens are designed to be terminated
within the cable glands.
A
S
N
12
Earthing is according to the documentation.
A
A
A
13
Earth continuity is satisfactory.
A
N
A
14
Electrical connections are tight.
A
S
N
15
Point to point connections are correct.
A
N
N
16
There is no visible damage to equipment or
cables and there is no undue accumulation of
dust or dirt. Whenever possible, check flame
path for signs of damage.
A
A
A
17
Equipment is adequately protected against
corrosion,
moisture,
vibration,
excessive
temperature, and other adverse factors.
A
A
A
18
Installation
is
in
compliance
with
the
documentation.
A
S
N
In the above chart,
A=
All,
S=
Sample and
N=
Not required by the standard, but sample is
recommended.
Summary of Contents for RCI-4100
Page 2: ......
Page 6: ......
Page 8: ......
Page 28: ......
Page 36: ......
Page 58: ......
Page 70: ......
Page 82: ......
Page 88: ......
Page 92: ......
Page 94: ......
Page 100: ......
Page 102: ......
Page 104: ......
Page 106: ......
Page 108: ......
Page 110: ......
Page 112: ......
Page 114: ......
Page 126: ......
Page 128: ......
Page 130: ......
Page 132: ......
Page 140: ......
Page 142: ...WIND SPEED MONITORING OPTION MAN 1111 Rev H Copyright 2015 LSI Robway Pty Ltd Page 142 ...
Page 144: ......
Page 147: ...WIND DIRECTION MONITORING MAN 1111 Rev H Copyright 2015 LSI Robway Pty Ltd Page 147 ...
Page 148: ......
Page 150: ......
Page 156: ......
Page 158: ......
Page 162: ...TILT SENSING OPTION MAN 1111 Rev H Copyright 2015 LSI Robway Pty Ltd Page 162 ...
Page 164: ......
Page 170: ......
Page 171: ...SYSTEM DRAWINGS MAN 1111 Rev H Copyright 2015 LSI Robway Pty Ltd Page 171 ...
Page 172: ...SYSTEM DRAWINGS MAN 1111 Rev H Copyright 2015 LSI Robway Pty Ltd Page 172 ...
Page 173: ...SYSTEM DRAWINGS MAN 1111 Rev H Copyright 2015 LSI Robway Pty Ltd Page 173 ...
Page 174: ...SYSTEM DRAWINGS MAN 1111 Rev H Copyright 2015 LSI Robway Pty Ltd Page 174 ...
Page 175: ...SYSTEM DRAWINGS MAN 1111 Rev H Copyright 2015 LSI Robway Pty Ltd Page 175 ...
Page 176: ...SYSTEM DRAWINGS MAN 1111 Rev H Copyright 2015 LSI Robway Pty Ltd Page 176 ...
Page 177: ...SYSTEM DRAWINGS MAN 1111 Rev H Copyright 2015 LSI Robway Pty Ltd Page 177 ...
Page 178: ...SYSTEM DRAWINGS MAN 1111 Rev H Copyright 2015 LSI Robway Pty Ltd Page 178 ...
Page 179: ...SYSTEM DRAWINGS MAN 1111 Rev H Copyright 2015 LSI Robway Pty Ltd Page 179 ...
Page 180: ......
Page 182: ......