background image

The left central support shall be seated approximately 60˚ to the 
left in relation to the bathtub leg (see photo III).

The right central support shall be seated approximately 60˚to the 
right in relation to the bathtub leg (see photo IV).

lll

Approx. 60˚ 

lll

lV

lV

Approx. 60˚ 

LEFT CENTRAL SUPPORT

RIGHT CENTRAL SUPPORT

7

Summary of Contents for GEORGIA

Page 1: ...1 Installation instructions Front panel GEORGIA ...

Page 2: ... DESCRIPTION OF MATERIAL 5 2 PREPARING THE BATHTUB 5 3 ASSEMBLING THE FOUR SUPPORTS FOR THE FIRST PANEL 6 3 1 Central support units 6 3 2 End support units 8 4 ASSEMBLING THE FIRST PANEL 10 5 ASSEMBLING THE SECOND PANEL 11 ...

Page 3: ...3 1 2 3 4 ...

Page 4: ...e joint sections Bag of nuts and bolts containing 2 screws 2 washers 2 cap nuts 1 bit Panel 2 assembled central support units fig 1 2 assembled end support units fig 2 Bag of nuts and bolts containing 4 M10 nuts 6 serrated washers 4 upper rod supports 4 support plates 2 stops with nut 2 BATHTUB PREPARATION Check that all the perimeter of the bathtub is level and set at a height of 535 mm from the ...

Page 5: ... Before directly fitting the swivel piece C to the M10 threaded rod fit the upper end of the unit figure 1 adjusting the threaded rod G so that it is tight against the inside edge of the tub together with the upper support and its support plate F This can be achieved easily by turning the rod G Tighten the nuts H and the nut A Adjust the lower plate P until it is firmly set on the floor Ensure at ...

Page 6: ... 60 to the left in relation to the bathtub leg see photo III The right central support shall be seated approximately 60 to the right in relation to the bathtub leg see photo IV lll Approx 60 lll lV lV Approx 60 LEFT CENTRAL SUPPORT RIGHT CENTRAL SUPPORT 7 ...

Page 7: ...dge Adjust the height of the plate using the swivel unit of the J support so that the plate is above the bottom fold of the panel see photo V 3 2 OUTER SUPPORT UNITS Following figures 2 4 and 5 b fit the unit by introducing the swivel unit of the horizontal support D on the threaded M10 rod of the leveling crosspiece fastening it with two serrated washers included with the nuts and bolts and two n...

Page 8: ...ten the nuts H and the nuts E after changing the flat washers for the serrated washers supplied with the nuts and bolts Ensure at all times that you do not raise the tub when you fasten the nuts The black plugs must be parallel to the lower curve of the panel to support the panel turn the support unit towards it see photos VI and VIb The support shall be seated approximately 45 in relation to the ...

Page 9: ...be approximately level with the edge of the tub together with the support bases see photo VIII 4 ASSEMBLING THE FIRST PANEL Position the panel see photo IX lX lX Approx flush Approx flush Approx flush Vlll Vlll END SUPPORT ...

Page 10: ...el for it to fit into place under the edge of the bathtub The flexible nature of the panel means this can be done without damage or permanent deformation to the panel see figures 6 2 and 6 3 Start fitting it in position at the left end and place it below the edge of the tub When you get to each Velcro fastening V check that it is free Once the panel is in place fasten the Velcro V by pressing on t...

Page 11: ...of the joint section X on the firstpanelinstalled asshowninfigure8 If necessary for one panel to fit better on to the other remove the joint section and put it back when the second panel is in position For a better finish fit the profile X flush to the lower part of the panel ...

Page 12: ...0 59 41 212 0 23 40 03 39 Fax 212 0 23 40 59 42 Roca GmbH Feincheswiese 17 56424 Staudt Deutschland Tel 49 0 2602 93610 Fax 49 0 2602 936 122 Roca Polska Sp z o o ul Wyczolkowskiego 20 44 109 Gliwice Polska Tel 48 0 32 339 41 00 Fax 48 0 32 339 41 01 Roca Argentina S A Camino General Belgrano 2873 1824 Lanús Este Buenos Aires Argentina Tel 54 0 114 230 96 39 Fax 54 0 114 246 95 56 Roca S A R L BP ...

Reviews: