1-2
Getting Started
Receiving Your New Drive
It is your responsibility to thoroughly inspect the equipment before accepting the
shipment from the freight company. Check the item(s) received against your
purchase order. If any items are obviously damaged, do not accept delivery until
the freight agent notes the damage on the freight bill.
Unpacking
Remove all packing material, wedges, or braces from within and around the drive.
Remove all packing material from the heat sink. Leave the debris label in place.
If you find any concealed damage during unpacking notify the freight agent. Also,
leave the shipping container intact and have the freight agent make a visual
inspection of the equipment to verify damage.
Inspecting
After unpacking, check the item(s) nameplate catalog number against your
purchase order. An explanation of the catalog numbering system for the Bulletin
160 drive follows as an aid for nameplate interpretation. Refer to Figure 1.1 and
Figure 1.2.
Important:
Before you install and start up the drive, inspect for mechanical
integrity. Look for loose parts, wires, and connections.
Identifying Your Drive
Catalog Number
The figure below describes the 160 SSC catalog numbering scheme.
Catalog Number Explanation
Figure 1.1
➊
Amperage ratings vary based on voltage.
Note: Rockwell Automation offers a configured drive program which allows for NEMA rated 4, 4x, or 12 enclosures.
160 - A A02
N SF1
P1
Bulletin Number
Current Rating
➊
Enclosure Type
Voltage Rating
A01
A02
A03
A04
A06
A08
A10
A12
A18
N Open (IP20)
L
Low Profile
P Chassis Mount
(external heatsink)
R Chassis Mount
Replacement
A 200-240V, 1-Phase
200-240V, 3-Phase
B 380-460V, 3-Phase
First Position
Second Position
Third Position
Fourth Position
Sixth Position
Model
Fifth Position
Programmer
(Optional)
SF1 Analog Signal
Follower
PS1 Preset Speed
B1
Ready/Fault
Indicating Panel
P1
Program Keypad
Module
An “S” in the Bulletin
Number denotes a
single-phase input
voltage.
Summary of Contents for Allen-Bradley 160 SSC Series
Page 12: ...1 6 Getting Started End of Chapter ...
Page 58: ...5 20 Parameters and Programming End of Chapter ...
Page 66: ...A 4 Specifications End of Chapter ...
Page 75: ...Accessories and Dimensions B 9 Drilling Template A Figure B 10 ...
Page 76: ...B 10 Accessories and Dimensions Drilling Template B Figure B 11 ...
Page 82: ...C 6 CE Conformity End of Chapter ...
Page 87: ......