24
Rockwell Automation Publication 2711T-QS002C-EN-P - March 2019
Second Generation MobileView Tethered Operator Terminal
Connect Power to IP65 Junction Boxes
After an IP65 junction box has been mounted, configured, and wired or connected, apply power
to the junction box.
For information on 24V DC power supply requirements, see
.
After power has been applied, perform the following steps to verify that the IP65 junction box is
performing correctly.
1.
Verify that the power status indicator on the front of the IP65 junction box is lit and
green in color.
2.
Verify that the Ethernet status indicator on the front of the IP65 junction box is lit and
green in color.
3.
Connect a second generation MobileView terminal.
a. If the MobileView terminal has an illuminated E-stop button, verify that the
illuminated
E-stop status indicator on the front of the IP65 junction box is lit and green in color.
b. Verify that the status indicator bar on the front of the IP65 junction box is lit and
solid green in color.
4.
Push the illuminated E-stop push button on the second generation MobileView terminal
to trigger a stop.
Verify that the status indicator bar on the front of the IP65 junction box is lit and solid
red in color.
5.
Disconnect the MobileView terminal.
a. Verify that the status indicator bar on the front of the IP65 junction box changes
from solid red to solid yellow.
b. Verify that the status indicator bar reduces one blinking yellow light after each 1.67
seconds of disconnect time.
SHOCK HAZARD:
Supply the IP65 junction box and the second generation MobileView terminal
exclusively from power sources with SELV or PELV circuit protection according to EN 61131-2.
Only connect voltages and circuits that are separated from dangerous voltages (for example, by
means of sufficient insulation) to connections, terminals or interfaces up to a rated voltage of
50V DC.
IMPORTANT
See
for what the following colors represent.
IMPORTANT
When you disconnect a second generation MobileView terminal from an IP65
junction box, it begins a 10-second countdown to a system emergency stop.
Therefore, you have 10 seconds to reconnect a second generation MobileView
terminal or black bridge connector to keep the safety circuit complete.