T960521SR
This box contains
R O C K Y ' S E A Z Y R O L L E R S I N S T R U C T I O N S - S E N I O R C O M M E R C I A L
ITEM
#
1
5
7
9
13
15
19
21
25
29
31
57
59
61
63
67
73
101
103
105
107
109
203
211
DESCRIPTION
Self-tapping Screw
5/16"x1" Bolt
3/8" x 1" Bolt
3/8" x 1.5" Bolt
3/8"x8" Anchor Bolt
Concrete Anchor
5/16" Washer
3/8" Washer
Spring
Acorn Nut
3/8" Nut
#4 A-Frame
SR Bottom Base
White Knob
3rd Leg Frame
4" Commercial Hub
Large Handle
Male Grommet
Female Grommet
Plastic Bushing
Plastic Washer
Spring Guard
36' Strapping
4" Wheels
QTY
16
2
4
4
2
2
2
18
2
6
4
2
2
1
2
2
1
12
12
2
2
2
1
6
RE-
ORDER
#
501
505
507
509
513
515
505
21
517
523
525
57
59
533
535
541
547
549
549
555
555
109
589
585
Reversible Drill
1/2" Concrete (masonary) Drill Bit
Hammer & Center Punch (or large nail)
5/16" Hex Head Socket Bit
1/2" Wrench
5/8" Wrench
9/16" Wrench
Tools Required:
For use with Rocky's 4" twelve
sided commercial tubing.
1
Insert 4" hub (item #67) into one end of tube.
SELF-DRILLING
NOTE:
Tube length should be about
1'
wider than
pool.
67
2
6
For regular shaped pools, align
the outside edge of the tube
parallel with the end of the pool.
For irregular shaped pools, the
outside edge of the tube
should be 3'
i n s i d e
from the
end of
the pool.
5
1/16"
Insert the anchor bolt
(item #13) through the spring
(item #25) and through the hole
of the SR base.
Tighten the anchor bolt.
NOTE: Do not over tighten
15
4
3
MARK
#1
211
63
29
21
7
21
31
29
61
73
59
21
21
9
67
105
57
107
5
19
APPLY PETROLEUM BASED
GREASE
Bolt the castors (item #211) to the SR bottom base
(item #59) and to the 3rd leg frame (item #63), as
shown in the diagram. Next, bolt the 3rd leg frames
(item #63) to the SR bottom base (item #59). Bolt
the #4 A-frame (item #57) to the SR bottom base
(item #59).
Assemble one end unit to the tube, using the large
handle (item #73), as shown in the diagram.
Assemble the other end unit to the tube, using the
white knob (item #61).
For smoother operation, apply petroleum based
grease between the hub (item #67) and the black
plastic bushing (item #105). This should be done
once a year.
Position the assembled roller unit at the widest end
of the pool.
MARK
#2
13
25
109
2
Hit center slug
with hammer &
center punch,or
large nail.
Drive the concrete anchor into
the hole with a hammer. Leave
the anchor raised 1/16".
To set the concrete anchor, then tap
the slug into the hole with a hammer,
then using a center punch or large
nail drive the slug down into the
anchor forcing legs out into concrete.
Slug
Using one of the two holes in the A-frame as a guide,
make mark #1 on deck. With a 1/2" concrete drill bit,
drill a 1 1/2" deep hole at mark #1. Complete steps 5
and 6 before continuing with step 4.
On the other side of the roller unit, make mark #2 by
using one of the two holes in the A-frame as of guide.
With a 1/2" concrete drill bit, drill a 1 1/2" deep hole at
mark #2.
NOTE:
Set one bolt at front of frame on one end and one
at the rear of the frame on the other end.
Repeat with other side.
With 2 self-drill/tapping screws
(item #1), attach hub to tube
using
electric drill
. Apply
pressure to ensure screw
cuts into aluminum tube
then cuts it's own thread.
(No predrilling required)
1
V E R Y I M P O R T A N T
PREVENT DROWNING
Attach Warning Label to one end of tube.
®