ROCPOWER
‐
SMARTROC
‐
Battery
Bank
Installation
6
CHAPTER
2
Unpacking
CAUTION:
Please
be
careful
when
lifting
the
shipping
container
or
the
UPS.
These
items
are
heavy.
Improper
lifting
or
movement
may
cause
personal
injuries
or
property
damage.
•
Take
the
UPS
out
of
the
packing
material.
Retain
it
for
future
use.
•
Inspect
the
UPS
for
any
obvious
damage.
•
Standard
package
includes
a
User
Manual.
Installation
Location
It
is
necessary
to
select
a
proper
environment
to
install
the
unit
in
order
to
minimize
the
possibility
of
damage
to
the
battery
bank
and
extend
the
life
of
the
batteries.
Please
follow
the
instructions
below:
1.
Keep
at
least
20
cm
(8
inches)
clearance
from
the
rear
panel
of
the
battery
bank
to
the
wall
or
other
obstructions.
2.
Do
not
block
the
air
‐
flow
to
the
ventilation
openings
of
the
unit.
3.
Ensure
that
the
environmental
conditions
are
in
accordance
with
the
UPS
specifications
to
avoid
overheating
and
excessive
moisture.
4.
Do
not
place
the
battery
bank
in
a
dusty
or
corrosive
environment
or
near
any
flammable
objects.
5.
This
battery
bank
is
not
designed
for
outdoor
use.
Storage
Instructions
For extended storage through moderate climate (-15
to +30 °C / +5 to +86 °F), the batteries should be
charged for 12 hours every six (6) months by plugging
the UPS power cord into the wall outlet. Repeat this
every three (3) months in a high temperature (+30 to
+45 °C / +86 to +113 °F) environment.
Summary of Contents for SMARTROC
Page 1: ...power your future SMARTROC BATTERY BANK INSTALLATION User Manual...
Page 8: ...ROCPOWER SMARTROC Battery Bank Installation 8 Use with UPS Step 1 Step 2 A5 S1...
Page 10: ...ROCPOWER SMARTROC Battery Bank Installation 10 Step 3 Step 4...
Page 13: ...ROCPOWER SMARTROC Battery Bank Installation 13 Step 3 Step 4...
Page 23: ...ROCPOWER SMARTROC Battery Bank Installation 23 Note...
Page 24: ...ROCPOWER SMARTROC Battery Bank Installation 24 www ROCPOWER com 192321752020000...