25
25
EN
11.4
Selecting direction of aperture
&-32-/FEVVMIVWEVIGSRƼKYVIHF]HIJEYPXJSVMRWXEPPEXMSRSRXLIVMKLXLERHWMHIWIIRJVSQXLI
inspection hatch side).
Whenever corrective actions are carried out, pay the utmost attention when releasing, locking or
moving the internal mechanical parts. These operations could be hazardous for the installer.
*SVPIJXLERHMRWXEPPEXMSRW
•
9RPSGOXLIFEVVMIVWIIGLETXIV
•
8YVRXLIPMROEKIPIZIVEWWLS[RMRƼKYVI
•
1SZIXLIQIGLERMGEPWXST
•
0SGOXLIFEVVMIVWIIGLETXIV
OPENING
ON THE LEFT
OPENING
ON THE RIGHT
7
BARRIER INSTALLED ON THE RIGHT (SEEN FROM THE INSPECTION HATCH SIDE)
AND THE BOOM OPENING/CLOSURE GATE ON THE LEFT
BARRIER INSTALLED ON THE LEFT (SEEN FROM THE INSPECTION HATCH SIDE)
AND THE BOOM OPENING/CLOSURE GATE ON THE RIGHT
Summary of Contents for BI/004
Page 2: ...2 ...
Page 10: ...10 IT 4 6 5 90 3 ...
Page 24: ...24 24 EN 4 6 5 90 3 ...
Page 38: ...38 38 DE 4 6 5 90 3 ...
Page 52: ...52 52 FR 4 6 5 90 3 ...
Page 66: ...66 66 ES 4 6 5 90 3 ...
Page 80: ...80 80 PT 4 6 5 90 3 ...
Page 94: ...PL 94 94 4 6 5 90 3 ...
Page 103: ...103 ...