29
EN
7
11.4
Selecting direction of aperture
&-32-/ FEVVMIVW EVI GSRƼKYVIH F] HIJEYPX JSV MRWXEPPEXMSR SR XLI
right hand side (seen from the inspection hatch side).
Whenever corrective actions are carried out, pay the utmost
attention when releasing, locking or moving the internal mechanical
parts. These operations could be hazardous for the installer.
*SV0)*8LERHMRWXEPPEXMSRW
1.
9RPSGOXLIFEVVMIVWIIGLETXIV
2.
8YVRXLIPMROEKIPIZIVEWWLS[RMRƼK
3.
1SZIXLIQIGLERMGEPWXSTWIIGLETXIV
4.
0SGOXLIFEVVMIVWIIGLETXIV
INSTALLATION
ON THE RIGHT
INSTALLATION OF
THE LEFT
8
BARRIER INSTALLED ON THE RIGHT (SEEN FROM THE INSPECTION HATCH SIDE) AND THE
BOOM OPENING/CLOSURE GATE ON THE LEFT
BARRIER INSTALLED ON THE LEFT (SEEN FROM THE INSPECTION HATCH SIDE) AND THE
BOOM OPENING/CLOSURE GATE ON THE RIGHT