Mechanical release
In the event of a fault or mains power loss, the barrier may be released and opened manually.
For further information, refer to the locking/release operation in the manual of the
BIONIK4, BIONIK4HP, BIONIK6, BIONIK8 automation system.
If the barrier is unlocked while the controller is powered, the message
6WRS
flashes on the display until the barrier is locked again.
The flashing light and the signal lights (if installed) illuminate if the boom is moved manually.
If a "ventouse" electric lock is installed, unlocking the barrier cuts off the power supply, making it possible to move the boom
manually.
The barrier resumes normal operation once the release system is locked again.
19
Initial testing
The testing must be performed by qualified technical personnel.
The installer is required to measure impact forces and select on the control unit the appropriate
speed and torque values to ensure that the motorised door or gate remains within the limits defined
by the standards EN 12453 and EN 12445.
Make sure that the provisions in Chapter 1 "GENERIC WARNINGS are observed.
• Turn on the power supply.
• Perform travel acquisition.
• Set acceleration, speed and deceleration values. Check that the values are correct for the
installation type. The boom must approach the mechanical stop at low speed, and then press
gently against the stop to hold the boom in the closed position. Setting a value between
and
for parameter
ensures that the boom approaches and arrests against the stops slowly
without vibration. For booms up to 4 m in length, values between
and
are recommended
for parameters
and
. For longer booms, set a higher value.
NOTE
: for BIONIK8 barriers, pay special attention when setting parameter
. Avoid excessive
oscillation upon reaching the end stop when closing.ì
• Check that all connected controls are working correctly.
• Check that the release device functions correctly. The message
6W23
must flash on the display.
• Check if the impact forces are compliant with the EN 12453 and EN 12445 standards.
• Check that the safety devices are activated correctly.
• If installed, check the correct operation of the BreakAway
ACS/BA/60
detachable boom coupling
system.
• If the battery kit is installed, disconnect from mains and check that the batteries are working.
• Disconnect from mains power and disconnect the batteries (if used), then reconnect. With the
barrier stopped in an intermediate position, check that the manoeuvre is performed correctly.
• Check that the mechanical stops are set correctly. Repeat the travel acquisition procedure after
each adjustment.
• In the case of installations with two opposed barriers, request a manoeuvre and check that both
barriers function correctly.
• If a "ventouse" electric lock is used, check that when the boom is completely closed the lock
activates and the boom cannot be lifted from the fixed end rest with integrated magnet.
Summary of Contents for CTRL
Page 2: ...2 ...
Page 19: ...19 AGILIK KB MESSA A TERRA GROUNDING SCHEME 16 ...
Page 20: ...20 17 MESSA A TERRA GROUNDING SCHEME BIONIK4 BIONIK4HP BIONIK6 BIONIK8 ...
Page 290: ...290 ...
Page 291: ...291 ...