Getting Started
R&S
®
NGA100
17
User Manual 5601.8919.02 ─ 03
4.1.3
Unpacking and Checking the Instrument
Check the equipment for completeness using the delivery note and package contents
list for the various items. Check the instrument for any damage and loose parts. If there
is any damage, immediately contact the carrier who delivered the instrument.
Packing material
Retain the original packing material. If the instrument needs to be transported or ship-
ped at a later date, you can use the material to protect the control elements and con-
nectors.
Risk of damage during transportation and shipment
Insufficient protection against mechanical and electrostatic effects during transportation
and shipment can damage the instrument.
●
Always ensure that sufficient mechanical and electrostatic protections are provided
●
When shipping an instrument, the original packaging should be used. If you do not
have the original packaging, use sufficient padding to prevent the instrument from
moving around inside the box. Pack the instrument in antistatic wrap to protect it
from electrostatic charging
●
Secure the instrument to prevent any movement and other mechanical effects dur-
ing transportation
Delivery package
The package contents contain the following items:
●
R&S NGA100 power supply preloaded with two 230 V fuses
●
Four power cables
●
Two 115 V fuses (replace the preloaded fuses with these fuses depending on the
mains voltage, see
Chapter 4.2.2, "Switching On the Instrument"
more information)
●
One 5-pin plug for digital I/O port connection
●
One 8-pin terminal block plug for output connection
●
One Getting Started manual
●
One document folder containing Basic Safety instructions guide, KC and CE certifi-
cate
4.1.4
Setting Up the Instrument
The R&S NGA100 is designed for benchtop and rackmount.
Putting into Operation