R&S OSP
Getting Started
Sample Session
Quick Start Guide 1505.3896.62 - 14
62
meter. The following signal paths are required and have to be set dependent on the
frequency range.
●
Generator output to amplifier input
●
Amplifier output forward power to power meter
●
Amplifier output reverse power to power meter
3.5.1.1 Defining the Path for PA1
To have a defined condition for the path switching, it is recommended to start with the
R&S OSP in Reset condition.
Reset
To obtain the correct switching for a new path configuration, it is recommended to reset
the R&S OSP. Select in the OSP Panel >Configure >Deselect all Switches.
According to the above example, for amplifier PA1 the foll
owing paths are required:
Signal path
Required relay position
Sig Gen to PA1 input
R&S OSP-B101 / K11- NO
PA1 Fwd to Power Meter Ch A
R&S OSP-B102 / K1-1
PA1 Fwd to Power Meter Ch B
R&S OSP-B102 / K2-1
Start the OSP Panel and make sure not to take over any undesired relay setting.
Select therefore in the OSP Panel >Configure >Deselect all Switches.
After that, select the OSP-B101 dialog and set K11 to position NO. Do not forget to
select the K11 button.
Summary of Contents for OSP-B011
Page 132: ......