37
4 Adjustment
4
1
2
Loosen the SCREWS A.
3
Measure the tension with the TENSION METER (ST-011)
at the center.
4
Adjust the tension with SCREW B so that it will be 12 ~ 14
pounds.
4-7 Wire Tension Adjustment
Turn off the power and move the PEN CARRIAGE to the
left end.
PEN CARRIAGE
SCREW A
SCREW B
ST-011
TENSION
METER