3-38
9
10
11
Fix one end of the new WIRE and fix the DRIVE GEAR to the
DRIVE PULLEY with the screws.
12
Put the DRIVE PULLEY into the shaft and fix it with the E
RING. Then, fix the SHAFT STAY.
Wind the CARRIAGE WIRE around the DRIVE PULLEY
from bottom to the top, and fix the other end of the WIRE.
Remove the screws fixing the DRIVE GEAR and remove the
CARRIAGE WIRE from the PULLEY.
Make sure that the CARRIAGE WIRE does
not cross over.
SHAFT STAY
E RING
Summary of Contents for VersaCamm SP-540V
Page 31: ...2 10 2 3 SERVO BOARD ...
Page 32: ...2 11 ...
Page 37: ...2 16 2 4 HEATER BOARD ...
Page 40: ...2 19 2 5 SUB BOARD ...
Page 88: ...3 43 9 Carry out the LINEAR ENCODER SETUP ...
Page 150: ...4 53 4 9 Check and make sure that the tension is within the range If not adjust it again ...