background image

A

A

B

SECTION A-A

[3/8"]

10mm

[3/4"]

20mm

DETAIL B

SCALE 2 : 1

C

ROLLEASE

ACMEDA 

DIMENSIONS 

IN "MM"

SCALE:1:10

SIZE:

A3

PROPRIETARY & CONFIDENTIAL

THE INFORMATION CONTAINED IN THIS DRAWING IS THE SOLE PROPERTY OF 

ROLLEASE ACMEDA.  ANY REPRODUCTION IN PART OR WHOLE WITHOUT THE 

WRITTEN PERMISSION OF ROLLEASE ACMEDA IS PROHIBITED.

ITEM CODE:

PRODUCT SPECIFICATION SHEET

14 Mar 2018

DRAWN:

www.rolleaseacmeda.com

ITEM DESCRIPTION:

REV.

 

Page� 08

Wireguide Skylight Installation Manual | November 2018

2018 ©Copyright All Rights Reserved Rollease Acmeda

STEP 1� TEST OPERATION OF SKYLIGHT

STEP 2� IF NO CHANGES ARE REQUIRED,  

ASSEMBLE WEIGHT BAR END CAPS

STEP 1� SWING BOX COVERS INTO PLACE

FUNCTION CHECK

INSTALL BOX COVERS

SECTION B: | INSTALLATION

STEP 2� FIX IN PLACE WITH SCREW OR RIVET

HOLE LOCATIONS X4

NOTE: 

It is recommended that the Box covers are fixed in place to 

ensure they can not be accidentally dislodged�

Summary of Contents for WireGuide Skylight

Page 1: ...November 2018 WIREGUIDE SKYLIGHT INSTALLATION MANUAL...

Page 2: ...mages incurred by you resulting from errors in or omissions from the information included herein Rollease Acmeda reserves the right to make changes without further notice to any products to improve re...

Page 3: ...stallation Manual November 2018 2018 Copyright All Rights Reserved Rollease Acmeda ASSEMBLED PARTS SECTION A ITEMS REQUIRED 1 2 3 4 5 1 Spring Fabric Box 2 Motor Spool Box 3 Spring Fabric Tube 4 Motor...

Page 4: ...CRIMP THE WIRE TO THE DOMED TERMINAL STEP 3 INSERT WIRE WITH SPRING INTO L BRACKET STEP 4 PULL TIGHT MARK WIRE STEP 5 INSERT WIRE INTO BOLT CRIMP SECTION B INSTALLATION STEP 6 ASSEMBLE TIGHTEN NOTE T...

Page 5: ...FER TO PRE TENSION CHARTS FOR PRE TURNS REQUIRED SEE FOLLOWING PAGES Rollease Acmeda does not recommend exceeding suggested pre turn values SECTION B INSTALLATION Pre Turn Spanner available through Ro...

Page 6: ...7 17 18 18 18 18 18 18 17 17 17 17 17 17 4 17 17 17 17 17 17 17 16 16 16 16 16 16 16 1 40 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 15 15 5 1 60 15 15 15 15 15 15 16 16 15 15 15 15 15 15 15 1...

Page 7: ...18 18 18 18 18 18 18 18 18 18 1 20 18 18 18 19 19 19 19 19 19 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 1 40 18 18 18 18 18 18 17 17 17 17 17 17 17 17 17 17 17 17 17 5 1 60 17 17 17...

Page 8: ...nual November 2018 2018 Copyright All Rights Reserved Rollease Acmeda INSTALL MOTOR SPOOL TUBE INTO BOX STEP 1 INSTALL MOTOR HEAD ONTO MOTOR BRACKET SECTION B INSTALLATION STEP 2 SWING IDLER END INTO...

Page 9: ...Rollease Acmeda INSTALL SPOOL CORD STEP 1 UNLOCK PRE TENSION IDLER SECTION B INSTALLATION LEFT HAND SPRING UN LOCKED NOTE TAKE DOWN TUBE IF PRE TURNS NEED TO BE ADDED REMOVED R PULL WEIGHT BAR OUT CH...

Page 10: ...EP 1 TEST OPERATION OF SKYLIGHT STEP 2 IF NO CHANGES ARE REQUIRED ASSEMBLE WEIGHT BAR END CAPS STEP 1 SWING BOX COVERS INTO PLACE FUNCTION CHECK INSTALL BOX COVERS SECTION B INSTALLATION STEP 2 FIX IN...

Reviews:

Related manuals for WireGuide Skylight